Long Thanh airport resettlement area is spacious with villas and townhouses after nearly 5 years

ANH CHIẾN - ANH TÚ |

Dong Nai - The 280-hectare Long Thanh airport resettlement area has become a bustling urban area, bringing a better life than before to the people.

Comfy life in the Long Thanh airport resettlement area

Since the first 24 households were handed over land to build houses and stabilize their new lives in the Loc An - Binh Son resettlement area, after giving up land to build Long Thanh airport (May 21, 2021), up to now, after nearly 5 years, this resettlement area has become a spacious villa and townhouse area with the most modern technical infrastructure and social infrastructure in Dong Nai province.

Khu tai dinh cu Loc An - Binh Son. Anh: HAC
Loc An - Binh Son resettlement area. Photo: HAC

According to the actual records of Lao Dong Newspaper reporters, a vast rubber forest has now become a resettlement area for people in the Long Thanh airport area with thousands of villas and townhouses located close together that have been built. People's lives have completely "transformed" compared to before the relocation.

Currently, the Loc An - Binh Son resettlement area has completely built a traffic system, water supply system, rainwater drainage system, wastewater, electricity supply and lighting system, communication pipes, and built wastewater treatment plants.

Truong hoc duoc xay dung phuc vu con em tai dinh cu san bay Long Thanh. Anh: AC-AT
Schools were built to serve children of resettled households at Long Thanh airport. Photo: AC-AT

Also in the Loc An - Binh Son resettlement area, there are 11 social infrastructure projects built including 4 kindergartens, 2 primary schools, 2 secondary schools, 1 market, 1 cultural center and 1 headquarters of the People's Committee of the commune.

Mr. Nguyen Khanh Phuong (43 years old) worked as a rubber worker before moving, giving up land to build Long Thanh airport. After that, the entire family of 15 main households and supporting households moved to the Loc An - Binh Son resettlement area. Mr. Phuong's family was granted a resettlement plot on D18 road, Suoi Trau hamlet, Long Thanh commune.

Mr. Phuong has now stabilized his life with a job at a company in Phuoc Binh Industrial Park, Dong Nai province. Mr. Phuong's wife works as a cook at a kindergarten near her home, and her children also study stably in the resettlement area. Mr. Phuong said that he was very satisfied with his new, spacious and modern life. I used to live in a dark fields. Now here, the street lights are bright, the plastic roads are beautiful, the electric wires and water are all negative underground, there are no tangled handles so it feels very comfortable".

Forming an urban area next to Long Thanh airport

According to the reporter's investigation, the plots of land in the resettlement area were sought after by people from many places from Ho Chi Minh City and Dong Nai. Each plot of land with an area of 5m x 20m is offered for 1.2 billion VND to 1.8 billion VND, while corner lots and villas can be up to 9-10 billion VND.

Near the Loc An - Binh Son resettlement area, many real estate projects have also been formed, expected to create a bustling urban area in the future.

Toan canh khu tai dinh cu Loc An - Binh Son. Anh: AC-AT
Overview of Loc An - Binh Son resettlement area. Photo: AC-AT

The Loc An - Binh Son resettlement area with an area of over 280 hectares was started in 2020 and put into use in 2021, serving the resettlement of people who gave up land to build Long Thanh airport. The resettlement area has 2 component projects: the construction of technical infrastructure systems and social infrastructure.

To implement the Long Thanh airport project, Dong Nai province must reclaim an area of about 5,000 hectares. Of these, nearly 3,000 hectares are land under the use rights of households and individuals, accounting for nearly 59% of the total project area. In the project implementation area, nearly 5,600 households are affected. Among the households affected by the project, there are nearly 4,600 households subject to resettlement.

In parallel with the resettlement arrangement, the authorities of Dong Nai province are implementing solutions to solve employment problems so that people can soon stabilize their new lives in the Loc An - Binh Son Resettlement Area. According to the reporter's research, many children of people living in the Long Thanh airport resettlement area have now found new jobs at many companies in industrial parks in the area, especially Loc An - Binh Son industrial park, located opposite the resettlement area, just off Provincial Road 769.

Some images recorded by Lao Dong newspaper reporters at the Long Thanh airport resettlement area:

Hang nghin ho dan da ve sinh song on dinh tai khu tai dinh cu san bay Long Thanh. Anh: AC-AT
Thousands of households have returned to live stably in the Long Thanh airport resettlement area. Photo: AC-AT
Nhung can nha biet thu, nha pho moc len nhu nam. Anh: AC-AT
Villas and townhouses are formed. Photo: AC-AT
Khu tai dinh cu co ha tang ky thuat hien dai, day la khu tai dinh cu hien dai nhat nhi tinh Dong Nai. Anh: AC-AT
The resettlement area has a modern technical infrastructure, this is the second most modern resettlement area in Dong Nai province. Photo: AC-AT
Dia danh Suoi Trau duoc giu lai tai khu tai dinh cu Loc An - Binh Son sau khi di doi. Anh: AT-AT
The place name Suoi Trau was kept in the Loc An - Binh Son resettlement area after relocation. Photo: AT-AT
Cuoc song nguoi dan tot hon sau khi di doi toi noi o moi. Anh: AC-AT
People's lives have improved after moving to new residences. Photo: AC-AT
Lanh dao tinh Dong Nai ban giao dat tai dinh cu, trao so do cho 9 ho dan dau tien trong khu tai dinh cu Loc An - Binh Son. Anh tu lieu: HAC
Dong Nai provincial leaders handed over resettlement land and presented red books to the first 9 households in the Loc An - Binh Son resettlement area. Documentary photo: HAC

On May 21, 2021, the first 24 people were handed over land by the local government in the Loc An - Binh Son resettlement area, part of the Long Thanh airport project.

ANH CHIẾN - ANH TÚ
RELATED NEWS

Close-up of the urgent construction at Long Thanh airport to welcome the first flight in 15 days

|

Dong Nai - In just 15 days, Long Thanh airport will welcome the first technical flight (December 19).

17 days of sprinting before Long Thanh airport welcomes the first flight

|

Dong Nai - With only 17 days left, the Long Thanh airport project must be basically completed, ensuring standards and conditions for inauguration and welcoming the first flight.

Hung Yen kumquat garden enters peak season to serve Lunar New Year

|

Hung Yen - These days, kumquat gardens in Hoan Long commune are entering peak care and sale, attracting buyers from many localities.

Germany declares Trump has crossed the red line in the Greenland case

|

Germany believes that the US President's request to annex Greenland is an act of "extortion", and calls on the EU to activate an economic coercion mechanism in response.

Stocks maintain green color thanks to bluechip stocks

|

The recovery of bluechip stocks and the banking group helped the stock market increase sharply, returning to conquer the 1,900-point mark.

Hanoi adjusts the overall planning of the Red River urban subdivision

|

Hanoi - The Red River urban sub-area will serve the needs of resettlement and relocation for about 50,000 people.

Top provinces and cities leading the national excellent student exam in the 2025-2026 school year

|

Ho Chi Minh City, Ninh Binh, Phu Tho rose to lead the country in the number of prizes in the national excellent student exam for the 2025-2026 school year. Hanoi ranked 5th.

Coach Kim Sang-sik refuses to share about Dinh Bac's injury

|

On the afternoon of January 19, coach Kim Sang-sik attended a press conference before the 2026 AFC U23 Championship semi-final match between U23 Vietnam and U23 China.

Close-up of the urgent construction at Long Thanh airport to welcome the first flight in 15 days

NHÓM PHÓNG VIÊN |

Dong Nai - In just 15 days, Long Thanh airport will welcome the first technical flight (December 19).

Toàn cảnh tiến độ siêu dự án sân bay Long Thành trước ngày đón chuyến bay đầu tiên

Nhóm PV |

Đồng Nai - Dự án sân bay Long Thành đang tăng tốc thi công, hướng tới mục tiêu đón chuyến bay đầu tiên vào ngày 19.12 và đưa vào khai thác năm 2026.

17 days of sprinting before Long Thanh airport welcomes the first flight

ANH CHIẾN - ANH TÚ |

Dong Nai - With only 17 days left, the Long Thanh airport project must be basically completed, ensuring standards and conditions for inauguration and welcoming the first flight.