Hanoi adjusts traffic to serve the repair of Tran Nhat Duat bridge

Minh Hạnh |

The Hanoi Department of Construction has just announced traffic organization adjustments on a number of streets to serve the periodic repair of Tran Nhat Duat Bridge.

According to the announcement, to serve the construction of Tran Nhat Duat Bridge (Km2+215 of the Hanoi - Dong Dang railway line), the entire road for rudimentary vehicles on Long Bien Bridge (including motor vehicles, rudimentary vehicles and pedestrians) from Bo De Ward to Hoan Kiem District will be temporarily banned from circulation during the construction period.

Vehicles moving in the direction of Long Bien - Xuan Quan are guided through Chuong Duong Bridge.

During the above time, cars are prohibited from crossing Chuong Duong Bridge (from Hoan Kiem to Bo De) to turn right or turn around at the Xuan Quan dike turnover intersection during rush hour (morning from 6:00 am to 9:30 am; afternoon from 4:00 pm to 7:30 pm). Vehicles traveling in the direction of Chuong Duong - Nguyen Van Cu - Hong Tien - Long Bien - Xuan Quan bridge.

At the same time, cars are prohibited from turning around along Chuong Duong Bridge to the center of Long Bien District at the median strip opening point on Nguyen Van Cu Street (area of Lane 162 Nguyen Van Cu - opposite the Customs Branch) during the morning rush hour (from 6:00 am to 9:30 am, except for Saturday and Sunday). Vehicles are instructed to turn around at the Nguyen Van Cu - Hong Tien intersection.

The Department of Construction requested the Traffic Police Department - Hanoi City Police to coordinate in guiding and regulating traffic, ensuring safety and avoiding congestion during construction. The People's Committees of Bo De and Hoan Kiem wards are required to increase propaganda and notify people around the construction area to proactively plan the travel route.

The Transport Inspectorate - Department of Construction will inspect and supervise the implementation of investors and construction contractors, ensuring compliance with traffic organization plans and safety regulations during road closures and closures.

Implementation time: From 0:00 on November 1, 2025 to 24:00 on December 31, 2025.

Minh Hạnh
RELATED NEWS

Hanoi adjusts the time to ban vehicles from crossing Long Bien Bridge

|

Hanoi will temporarily ban all roads for rudimentary vehicles on Long Bien bridge from Bo De ward to Hoan Kiem ward for 61 days.

Hopefully, the site clearance milestone for the high-speed railway project will be handed over soon

|

The investor has not yet handed over the site clearance markers for the high-speed railway project, so the Ha Tinh functional sector is concerned about great pressure as time is getting faster.

Congestion prolonged when Long Bien Bridge is fenced off for periodic repairs

|

Hanoi - On the morning of October 29, many people living in the old Long Bien district were surprised to see Long Bien bridge fenced off to serve the periodic repair construction.

Reasons why buyers lost nearly 7 million VND after a week even though gold prices did not decrease too much

|

The decrease in domestic gold prices, combined with the high difference between buying and selling, has caused many investors to suffer heavy losses after just one week.

Luu Xa Station road is flooded with red liquid like blood, overflowing into the sewers

|

Thai Nguyen - Luu Xa Station road surface has a red liquid suspected to be ore, overflowing into the sewers, causing people to worry about environmental pollution.

Ukraine declares it has not submitted to Russia's holdup in Pokrovsk

|

The Ukrainian military said it was still holding on to Pokrovsk, where Russia claimed to have closed the besiege, gaining a major advantage after more than a year of fighting.

The scammer Chen Zhi's trick to turn Singapore into a perfect homecoming

|

scammer Chen Zhi is said to have taken advantage of Singapore as a legitimate destination to conceal billions of dollars worth of illegal activities.

2025 - a turbulent year for Truong Ngoc Anh

|

Truong Ngoc Anh has gone through a turbulent year in finance and personal life, before getting into trouble with the law.

Hanoi adjusts the time to ban vehicles from crossing Long Bien Bridge

Minh Hạnh |

Hanoi will temporarily ban all roads for rudimentary vehicles on Long Bien bridge from Bo De ward to Hoan Kiem ward for 61 days.

Hopefully, the site clearance milestone for the high-speed railway project will be handed over soon

TRẦN TUẤN |

The investor has not yet handed over the site clearance markers for the high-speed railway project, so the Ha Tinh functional sector is concerned about great pressure as time is getting faster.

Congestion prolonged when Long Bien Bridge is fenced off for periodic repairs

Minh Hạnh |

Hanoi - On the morning of October 29, many people living in the old Long Bien district were surprised to see Long Bien bridge fenced off to serve the periodic repair construction.