High speed train

Relocating the Ho Chi Minh City - Vung Tau high-speed train terminal at Bach Dang terminal to build a 1,000 billion VND pedestrian bridge

|

HCMC - The high-speed train line from the center of HCMC to Vung Tau has been suspended since May 5 to serve the construction of a pedestrian bridge across the Saigon River at Bach Dang wharf (District 1).

High-speed ships have to ask fishing boats to to towing them when entering and leaving Phan Thiet port due to silting

|

Binh Thuan - In the past 5 days, there have been 27 high-speed trains from Phan Thiet to Phu Quy Island. Due to the busy port gate, fishing boats towing in and out of Phan Thiet port.

Temporarily suspending the Vung Tau - Con Dao high-speed train on April 15-16

|

Ba Ria - Vung Tau - The Thang Long high-speed train will temporarily suspend the operation of the Vung Tau - Con Dao route and vice versa for 2 days for technical inspection.

Ho Chi Minh City high-speed train to Con Dao temporarily suspended due to bad weather

|

The Ho Chi Minh City - Con Dao high-speed train operator (Ba Ria - Vung Tau province) announced the temporary suspension of operations on September 1-2 due to bad weather.

Thang Long high-speed train will resume operation of Ho Chi Minh City - Con Dao route

|

Ba Ria - Vung Tau - The Thang Long high-speed train operator with 1,017 seats is completing procedures to re-operate the Ho Chi Minh City - Con Dao route.

The high-speed train from the center of Ho Chi Minh City to Con Dao takes 5 hours and 30 minutes

|

On March 21, the high-speed train route from Saigon port (District 4, Ho Chi Minh City) to Con Dao was officially launched, marking a new step forward in connecting sea traffic.

High-speed train from the center of Ho Chi Minh City to Con Dao for the first time

|

HCMC - From March 29, people and tourists will have more options to travel to Con Dao by high-speed train starting right from the city center.

High-speed train to Con Dao temporarily suspended due to bad weather

|

Con Dao - Due to rough seas and unfavorable weather, many high-speed trains to Con Dao will be temporarily suspended.

Only 3 high-speed trains run on the Phan Thiet - Phu Quy route

|

Binh Thuan - At one point, 6 high-speed ships were operating the Phan Thiet - Phu Quy island route at the same time, but currently there are only 3 ships left.

Ho Chi Minh City has a high-speed train to Con Dao from March 28, welcoming guests in District 4

|

HCMC - The HCMC - Con Dao high-speed ship has been operating since March 28 at Saigon Port (District 4), with a capacity of 374 people.

Breaking through a mattress ship from China faster than the Boeing 737

|

The Chinese bullet train T-Flight has a top speed of 965 km/h, significantly faster than the average flight speed of long-haul Boeing passenger aircraft.

Customers are excited to take the speedboat to Con Dao on the day it resumes operation

|

Ba Ria - Vung Tau - On the first day of resumption, many tourists were excited to experience the Thang Long high-speed train with more than 1,000 seats from Vung Tau to Con Dao.

China develops high-speed trains faster than airplanes

|

China is developing 1,000 km/h bullet train, faster than the speed of commercial aircraft.

Proposed location of high-speed train station in Thanh Hoa

|

Thanh Hoa - News from the Thanh Hoa Department of Transport on October 14, the unit has just sent an official dispatch to the Provincial People's Committee advising on proposed locations for high-speed railway stations in the area.

China's high-speed rail exceeds Sun Yat-sen's expectations

|

The development of China's high-speed railway has exceeded the expectations of revolutionary leader Sun Yat-sen more than a century ago.