Lo River

Prime Minister praises units for rapid completion of pontoon bridge across Lo River

|

Prime Minister Pham Minh Chinh praised the "lightning-fast" units that completed the pontoon bridge across the Lo River, opening to traffic on the morning of the 29th of Tet.

Prime Minister requests conclusion of investigation on the damage of Lo River bridge in February

|

The Prime Minister requested that in February 2026, the investigation conclusion on the occurrence of damage to the Lo River bridge must be completed for handling according to regulations.

Phu Tho agrees to allow UDIDECO to repair Lo River bridge

|

Phu Tho - The Department of Construction has just issued a document approving the unit to carry out the construction of repairing and overcoming damage to the Lo River bridge project.

Red River dries up to the bottom of the sand, Lo River dries up to the underground rocks

|

Phu Tho - The water level of rivers in the area at present has dropped low, the Red River is dry with only sand at the bottom, and the Lo River is dry with only underground rocks.

Lo River is dry, fishermen struggle to make a living

|

Tuyen Quang - Many areas on the Lo River are bare, affecting the lives and livelihoods of fishing villagers.

Lo River is illegally encroached upon due to lax management

|

Tuyen Quang - Functional agencies clearly point out that there is loosening of land management leading to encroachment on the Lo River, illegal construction, and not resolutely handling it thoroughly.

Encroaching on the Lo River causes the flow to be blocked, when the flood next year is stronger than the previous year.

|

Tuyen Quang - The situation of encroachment on the Lo River has not been completely resolved, the consequences have been clearly seen when the flow is blocked, and floods are always higher than the previous year.

Lo River is killed by a series of illegal encroachment works

|

Tuyen Quang - A series of illegally encroached construction projects for a long time have gradually narrowed the Lo River bed, and the flow has been constricted.

Lo River overpass in Tuyen Quang exposed

|

The situation of An Hoa bridge piers crossing the Lo River has shown signs of being deeply distorted.

Preparing for the peak of the dry season, the Lo River begins to dry up

|

Tuyen Quang - Although not yet the peak of the dry season, many upstream areas of the Lo River have begun to dry up, exposing underground rock covers.

Construction University Consulting Company will comprehensively inspect the Lo River bridge

|

Phu Tho - Construction University Consulting Company Limited is currently conducting an inspection and assessment of the overall damage to the Lo River bridge project.

Investing 40 billion VND to treat landslides on the Lo River bank in Phu Tho

|

Phu Tho - The Lo River bank through Song Lo commune and the right bank of Pho Day River through Tien Lu commune have been invested with 40 billion VND to treat landslides.

The contractor for the Song Lo bridge proposed to repair the damage

|

Phu Tho - The contractor for the Song Lo bridge has proposed that the Provincial People's Committee and the Department of Construction repair and repair the bridge damage with corporate capital.

Banning all cars across the Lo River bridge in Phu Tho

|

Phu Tho - The provincial Department of Construction has just announced the adjustment of traffic flow through the Lo River Bridge, Doan Hung Commune.

Water level forecast for the Red River and Lo River in Phu Tho in November

|

Phu Tho - In November, the water level of the Red River (Thao River) and the Lo River is forecast to gradually decrease, and there is no longer a possibility of flooding.