Ring Road 4 HCMC
Hot Saigon: The Northeast Gateway of Ho Chi Minh City is about to be expanded to 60 m, adding a 4-lane elevated road
|
Hot Saigon October 17: The Northeast Gateway of Ho Chi Minh City is about to be expanded to 60 m, adding a 4-lane elevated road; People with HIV/AIDS hope that the drug source will be maintained more regularly...
HCMC plans to start construction of a 4-lane expressway connecting Dong Nai and Tay Ninh
|
HCMC - The Ring Road 4 project is 203 km long, passing through HCMC, Dong Nai, Tay Ninh with a total capital of more than VND 120,000 billion, and will start construction in 2026, and be completed in 2028.
Becamex IDC participates in the construction of 6 infrastructure projects with a total investment of VND 60,000 billion
|
HCMC - Becamex IDC Corporation said that in 2025, it has started construction of 6 key projects with a total investment of VND 60,000 billion.
Becamex IDC recommends early handover of site for construction of 2 projects worth VND38,818 billion
|
HCMC - Becamex IDC Corporation proposed to speed up the handover of land to construct 2 key transport infrastructure projects.
Tay Ninh prepares 7 resettlement areas to serve the Ho Chi Minh City Ring Road 4 project
|
Tay Ninh plans to arrange 7 resettlement areas with more than 3,300 plots to serve the site clearance of the Ho Chi Minh City Ring Road 4 project, the section passing through the province.
Reasons why the more than 200 km beltway, the largest in the Southeast, is not closed
|
HCMC - Ring Road 4 is more than 200 km long, with 4 lanes, passing through HCMC, Tay Ninh, Dong Nai will not be closed in a circle but will only form a route in the shape of the letter "C".
HCMC reclaims land from more than 3,300 households to build the largest road in the Southeast
|
Ho Chi Minh City will reclaim land from more than 3,300 households, including households in Binh Duong and Ba Ria - Vung Tau (old), to implement the Ho Chi Minh City Ring Road 4 project, more than 200 km long.
Ho Chi Minh City Ring Road 4 is invested with more than VND 120,400 billion with a series of special mechanisms and policies
|
Politburo member and National Assembly Chairman Tran Thanh Man has signed and issued a Resolution of the National Assembly on the investment policy for the Ho Chi Minh City Ring Road 4 project.
Over VND120,000 billion invested in the nearly 210km Ho Chi Minh City Ring Road 4 project
|
After the National Assembly approved the investment policy, the Ho Chi Minh City Ring Road 4 project is being urgently prepared for implementation by localities. This is a strategic traffic route connecting, creating growth momentum for the entire key economic region in the South.
Perspective of the Ho Chi Minh City Ring Road 4 project through Binh Duong
|
Binh Duong - Ho Chi Minh City Ring Road 4 phase 1 will be built with 4 lanes, while the section passing through VSIP 2A and My Phuoc 3 Industrial Parks will be built with 10 lanes.
Deputy Prime Minister Mai Van Chinh attends the groundbreaking ceremony of Ho Chi Minh City Ring Road 4 through Binh Duong
|
Binh Duong - On June 18, Deputy Prime Minister Mai Van Chinh attended the groundbreaking ceremony of the Ho Chi Minh City Ring Road 4 construction project through Binh Duong province.
Invitation for investment in the 45km long belt road connecting Ho Chi Minh City with 4 districts of Dong Nai
|
Dong Nai - The total investment of the Ho Chi Minh City Ring Road 4 project in phase 1 is about VND 24,759 billion.
Notice of land reclamation in 1,031 cases for the Ho Chi Minh City Ring Road 4 project
|
Binh Duong - Localities in Binh Duong have issued notices of land reclamation for 1,031 cases to build the Ho Chi Minh City Ring Road 4 project.
Dong Nai commits to budget capital for the construction of the Ho Chi Minh City Ring Road 4 expressway
|
The Ring Road 4 - Ho Chi Minh City Expressway project is about 160 km long, passing through 5 provinces and cities of Ba Ria - Vung Tau, Dong Nai, Binh Duong, Long An and Ho Chi Minh City.
HCMC invests nearly VND18,300 billion to build 2 new strategic routes
|
Ho Chi Minh City spends nearly VND12,000 billion to build Ring Road 4 connecting surrounding provinces and nearly VND6,300 billion to build Binh Tien bridge and road connecting Districts 6, 8, Binh Chanh.