Saigon River

Saigon River pedestrian bridge enters key structural construction phase

|

Ho Chi Minh City - In the afternoon of May 11, the Saigon River pedestrian bridge project poured concrete for the first main pier base, aiming to be completed on September 2, 2026.

Pouring the first batch of concrete for the pedestrian bridge pillars worth nearly 1,000 billion VND across the Saigon River

|

Ho Chi Minh City - In the afternoon of May 11, the pedestrian bridge project across the Saigon River poured the first batch of concrete base pillars, striving to be inaugurated in 2026.

Ho Chi Minh City to build a new Square and Administrative Center in Thu Thiem

|

Ho Chi Minh City is preparing to build a new Central Square and Administrative Center in Thu Thiem New Urban Area, laying the foundation for a new development space.

Metro connecting the two banks of the Saigon River is expected by people

|

Ho Chi Minh City - With a capital of 33,000 billion VND, Ben Thanh - Thu Thiem Metro is expected to be completed soon, meeting the people's expectations for a connected transportation system.

Ho Chi Minh City today: Proposal to invest in a Saigon riverside avenue of more than 78 km, combined with railway

|

Ho Chi Minh City has 9 more VinBus electric bus routes from March 1st; Proposal to build a Saigon riverside avenue more than 78 km long, integrating light rail...

Proposal to build a Saigon riverside avenue more than 78 km long, integrating light rail

|

Ho Chi Minh City - The Saigon riverside avenue, more than 78 km long, 8 - 10 lanes wide, along with a light/ground-based railway line along the river corridor, has just been proposed for investment.

River bus opens throughout Tet, attracting visitors to explore Ho Chi Minh City from the Saigon River

|

Ho Chi Minh City - During the 2026 Lunar New Year, the river bus route operates throughout, becoming a destination attracting a large number of people and tourists to visit and experience.

A restaurant yacht catches fire on the Saigon River

|

Ho Chi Minh City - Restaurant yacht on Saigon River suddenly catches fire, functional forces are controlling the fire.

Revelation of nearly 1,000 billion VND pedestrian bridge across the Saigon River

|

Ho Chi Minh City - After 9 months of construction, the pedestrian bridge across the Saigon River worth nearly 1,000 billion VND has formed core items.

Investigation into the discovery of a male body floating on the Saigon River

|

HCMC - HCMC Police conduct an investigation of the scene and investigate the cause of death of a male body floating on the Saigon River.

HCMC today: Reasons for the delay in the opening of the first elevated road in HCMC

|

The Traffic Department stated the reasons for the delay in the opening of the first elevated road in Ho Chi Minh City; Prohibiting vehicles from traveling through the tunnel across the Saigon River...

Current status of the project to build a 10-hectare park along the Saigon River in Ho Chi Minh City

|

HCMC - The Ba Son Park project, phase 2 along the Saigon River, is under construction, expected to become a modern green square - park.

Young man stabs in the abdomen with a knife and jumps into Saigon River

|

HCMC - A young man stabbed himself in the abdomen with a knife and jumped into the Saigon River from Thu Thiem 1 Bridge.

The Northeast gateway bridge of Ho Chi Minh City is raised by 1.25m using synchronous hydraulic shock technology

|

HCMC - When completed, the project to raise the clearance of Binh Phuoc 1 Bridge will facilitate trade between HCMC and localities.

HCMC on October 15: finalizing a series of strategic transport projects to soon end traffic jams

|

HCMC finalizes a series of strategic transport projects to soon end traffic jams; The first bicycle lane is under construction, people expect to promote green transportation...