Metro train breakdown, thousands of people waiting at rush hour
NHÓM PV |
HCMC - Heavy rain and sudden lightning triggered the electrical safety protection system of Metro Line 1, forcing people to wait in line during rush hour.
NHÓM PV |
HCMC - Heavy rain and sudden lightning triggered the electrical safety protection system of Metro Line 1, forcing people to wait in line during rush hour.
|
HCMC - Heavy rain and lightning have activated the electrical safety protection system of Metro Line 1, causing the train schedule to be temporarily suspended.
|
HCMC - Ben Thanh Station of Metro Line 1 (Ben Thanh - Suoi Tien) will have a temporary parking lot at September 23 Park to serve train passengers.
|
HCMC - The Urban Railway Management Board and Urban Railway Company No. 1 said that Metro train No. 1 will be stopped at Ba Son station to check the operating procedures.
|
Quang Tri - Only allowed to use dredged sand for internal leveling, but many trucks transporting sand leave the seaport project for consumption outside.
|
Hanoi - A coffee shop in a adjacent villa area in Kien Hung ward caught fire fiercely, many security guards in the area tried to put out the fire but failed.
|
The viewpoint of promoting the strength of great national unity is expressed throughout the documents of the 14th Party Congress.
|
Hanoi - Noi Bai International Airport (HKQT) is expected to welcome about 720,000 passengers during the peak Tet Nguyen Dan 2026 season.
|
Gold price today 7/2: Simultaneously increases. Plain gold rings and SJC gold bars in the country are adjusted up 7 to 7.1 million VND/tael.
NHÓM PV |
HCMC - Heavy rain and lightning have activated the electrical safety protection system of Metro Line 1, causing the train schedule to be temporarily suspended.
MINH QUÂN |
HCMC - Ben Thanh Station of Metro Line 1 (Ben Thanh - Suoi Tien) will have a temporary parking lot at September 23 Park to serve train passengers.
Minh Tâm |
HCMC - The Urban Railway Management Board and Urban Railway Company No. 1 said that Metro train No. 1 will be stopped at Ba Son station to check the operating procedures.