Building a bridge at the billion-dollar intersection to relieve traffic jams in the East of Ho Chi Minh City

|

HCMC - In phase 3 of the My Thuy intersection project, an overpass will be built on Ring Road 2 (right branch) and Ky Ha 3 bridge (right branch) to relieve traffic jams in the East of HCMC.

RELATED NEWS

The oldest delegate sends expectations to the 11th Congress of the Vietnam Fatherland Front

|

Among the delegates attending the 11th National Congress of the Vietnam Fatherland Front, term 2026-2031, Major General Vo So was the oldest delegate.

US fires on Iranian oil tanker amid new ultimatum from President Trump

|

US fires on Iranian oil tanker as President Trump warns Tehran of new airstrikes.

Parents and students in Ho Chi Minh City consider adjusting 10th grade aspirations

|

The 10th grade aspiration adjustment period in Ho Chi Minh City is about to end, many parents and students are still considering choosing a suitable school to increase their chances of admission.

Many illegal football websites are still operating

|

Many football smuggling sites are still operating with many different domain names.

The billion-dollar intersection in the East of Ho Chi Minh City is expected to be completed in 2026

Tâm Tú |

HCMC - After 9 years of construction, the My Thuy intersection project - a project expected to "rescue" traffic congestion in the East of HCMC continues to start construction in phase 3.

HCMC - Binh Duong breaks through infrastructure with 5 projects worth tens of thousands of billions

MINH QUÂN |

Expanding National Highway 13, the road connecting Ho Chi Minh City - Chon Thanh Expressway, Ring Road 3, Ring Road 4, and extending Metro Line 1 to increase connectivity between Ho Chi Minh City and Binh Duong.

HCMC builds 2 more bridges to relieve traffic jams in Thu Duc City

MINH QUÂN |

HCMC - The My Thuy Intersection Project (Thu Duc City) is implementing phase 3 with the construction of an overpass on Ring Road 2 and Ky Ha 3 Bridge, with a total capital of 312 billion VND.