372 people injured and killed in traffic accidents in Ha Tinh

TRẦN TUẤN |

Ha Tinh - In the first 9 months of 2024, there were 321 traffic accidents, killing 170 people and injuring 202 people.

That is the figure just announced by the Traffic Safety Committee of Ha Tinh province. Accordingly, there is an increase of 67 cases (26%), an increase of 23 deaths (16%), and an increase of 47 injuries (30%) compared to the same period in 2023.

Traffic accidents are still complicated, increasing in number of cases, deaths and injuries. The reason, according to the Ha Tinh Traffic Safety Committee, is mainly due to the limited awareness of traffic safety laws of some people at times.

There are also violations such as: not wearing helmets when riding motorbikes; violating alcohol concentration; speeding, reckless driving; not paying attention when crossing the street; changing direction in violation of regulations; driving in the wrong lane or on the wrong side of the road.

Violations of traffic safety corridors still occur in many places such as placing billboards, trees extending onto the road, obstructing visibility at intersections, curved roads, leveling land in traffic safety corridors, illegal connections... causing high potential risks of traffic accidents.

Hien truong vu tai nan giao thong nghiem trong lam 3 nguoi chet tren Quoc lo 1 o xa Cam Thinh, huyen Cam Xuyen, tinh Ha Tinh dot thang 6.2024. Anh: Tran Tuan.
The scene of a serious traffic accident that killed three people on National Highway 1 in Cam Thinh Commune, Cam Xuyen District, Ha Tinh Province in June 2024. Photo: Tran Tuan.

The situation of vehicles transporting construction materials running at high speed, dropping rocks and soil on the road, causing traffic insecurity and environmental pollution, has shown signs of increasing again; especially vehicles transporting construction materials on the routes serving the construction of the North-South Expressway.

Some locations of damaged road surfaces with structural cracks, potholes, faded and ineffective road markings still occur on National Highway 1 and provincial roads, creating potential traffic accidents that still exist but have not been resolved.

Repair and maintenance work by functional units is still slow and untimely; funding for regular maintenance and repair is limited.

The increasing number of road vehicles, especially on key national highways such as National Highway 1, National Highway 15, and Ho Chi Minh Road, is putting great pressure on ensuring traffic order and safety, affecting the situation and effectiveness of controlling and reducing traffic accidents.

Currently, Ha Tinh is synchronously implementing many solutions to reduce traffic accidents. Among them, increasing propaganda to raise awareness of traffic safety compliance, increasing patrols, controlling and handling traffic safety violations, launching a peak month to handle traffic safety violations by school-age children...

TRẦN TUẤN
RELATED NEWS

Stocks maintain recovery momentum

|

The focus of this week's stock market will be the mid-term assessment of market upgrades by FTSE Russell, a catalyst that opens up new waves of increase.

Stone mine "suspended" for 9 months, Gia Lai warns to replace commune leaders

|

Gia Lai - Although licensed, a quarry is still "suspended" for 9 months due to land lease procedures at the commune level.

Hanoi Industrial Meal Company won 148/148 bidding packages, with a total value of 505.8 billion VND

|

Hanoi Industrial Meal Service Joint Stock Company participated and won all 148 bidding packages to supply meals at schools in Hanoi and some northern provinces.

Teachers of Song Hong school nearly 20 months without salary, Phu Tho Department of Home Affairs speaks out

|

Phu Tho - Regarding the case of teachers of Song Hong Intermediate School who have not received salary for nearly 20 months, the Phu Tho Department of Home Affairs has spoken out.

400 billion VND for reconstruction, emergency traffic projects in Da Nang are still messy

|

Da Nang - After more than 4 years of construction, the nearly 400 billion VND emergency traffic project in the mountainous disaster area is still unfinished, bumpy as if it has never been rebuilt.

Day and night construction at the construction site of the widest cable-stayed bridge project in Hai Phong

|

Hai Phong - To date, the construction of the nearly 1,500m long cable-stayed main bridge under the Nguyen Trai bridge project has reached about 32% of the progress, striving to reach the finish line in September 2027.

Today the National Assembly considers and decides on personnel and organizational structure

|

According to the Session program, today April 6, the First Session of the 16th National Assembly officially opens.

Son La: Handling students violating traffic accident prevention

NHÓM PV |

This morning, October 1, the Traffic Police force of Son La province launched a high-profile campaign to ensure traffic order and safety for school-age children.

Traffic accidents in Hai Duong increased by 291 cases compared to the same period

Hoàng Khôi |

In the first 9 months of 2024, Hai Duong province had 539 traffic accidents and collisions, an increase of 291 cases over the same period.

Tai nạn giao thông được kiềm chế nhưng vẫn ở mức cao

Lan Nhi |

Bộ trưởng Bộ Giao thông Vận tải Nguyễn Văn Thắng cũng nhìn nhận, vẫn còn xảy ra ùn tắc giao thông, nhất là trong những ngày nghỉ lễ, Tết.