
Information from Lao Cai Road Company, the unit mobilized 3 excavators, bulldozers and about 30 workers to take advantage of the cool weather to overcome the landslide at Km127 + 700 National Highway 4D, Coc San commune, City. Lao Cai (Lao Cai province).
Accordingly, at the landslide site, workers cut trees and broke rocks on the slopes, and underneath excavators and bulldozers will work continuously to clear the soil and rocks.
Currently, there is a large amount of loose rock on the slopes, so we have to use human power, instead of machinery, to clear it.
Therefore, to ensure the safety of traffic participants, the unit will urgently carry out construction, and it is expected that by 3:00 p.m. this afternoon (July 23), traffic will be temporarily opened at Km127+700 on National Highway 4D.
According to the Lao Cai Department of Transport, the Department has coordinated with the Provincial Police to direct traffic diversion and guidance to ensure safety.
At the same time, mobilize machinery, equipment, and human resources to urgently overcome landslides, ensuring traffic in the fastest time.

Previously, as Lao Dong reported, at 7:30 p.m. on July 22, at Km127+700, National Highway 4D, section through Coc San commune, Lao Cai city (Lao Cai province), a large landslide occurred, cutting off traffic from city to Sa Pa and vice versa.
Immediately after the landslide occurred, Lao Cai Road Joint Stock Company deployed vehicles and human resources to the scene to fix it.
However, because the soil and rocks at the landslide point continued to fall onto the road, the traffic police force deployed a blockade at both ends of the landslide point to divert traffic and prevent people and vehicles from passing to ensure safety. ensure safety.