Cat Lai Bridge is an urgent project connecting Long Thanh Airport and Ho Chi Minh City

HÀ ANH CHIẾN |

Dong Nai - The investment project to build Cat Lai bridge, over 11km long, connecting Long Thanh airport and Ho Chi Minh City, is being submitted to the Provincial People's Council for consideration.

Cat Lai Bridge construction investment project: Construction time 2026 - 2029

On December 9, the Provincial People's Council considered the draft Resolution on the investment policy for the Cat Lai Bridge Construction Investment Project, according to the public-private partnership.

The Cat Lai Bridge construction investment project has a total estimated investment of nearly VND18,300 billion. Of which, the cost of construction and equipment is about 11,538 billion VND; the cost of compensation and resettlement support is about 2,985 billion VND...

The name of the investor proposing the project is Construction Corporation No. 1 - JSC.

This is a group A project, a special-level project.

The Cat Lai Bridge construction investment project has a starting point in Cat Lai ward, Ho Chi Minh City and an end point at the intersection with the Ben Luc - Long Thanh expressway.

In which, Cat Lai bridge and access road will be built with the scale of an urban main axis, designed speed of 80 km/h.

The total length of the project is more than 11.6 km.

The construction period is from 2026 to 2029.

The expected land use demand is about 120 hectares, of which Dong Nai province is about 115.8 hectares and Ho Chi Minh City is about 4.2 hectares.

The expected type of PPP project contract is a construction - transfer (BT) contract. Expected payment to investors from public land auction revenue or public investment capital.

Urgent project connecting Long Thanh airport and Ho Chi Minh City

According to the submission of the People's Committee of Dong Nai province, the form of investor selection is unified, applying the form of investor selection in special cases for the Cat Lai bridge project because these are urgent projects that need to be implemented to serve the exploitation of Long Thanh International Airport, connect Ho Chi Minh City and develop the socio-economy of Dong Nai province.

Mot phoi canh cau Cat Lai noi TPHCM va Dong Nai. Anh: So Xay dung tinh Dong Nai
Perspective of Cat Lai Bridge connecting Ho Chi Minh City and Dong Nai. Photo: Department of Construction of Dong Nai province

According to the submission of the People's Committee of Dong Nai province, Ho Chi Minh City and Dong Nai province are two localities located in the key economic development region of the South, with a particularly important position, being the driving force for socio-economic development of the whole country; therefore, it requires the inter-regional infrastructure system to develop to keep up with and meet the development speed of the region.

Currently, the connection between Ho Chi Minh City and Dong Nai province is still limited, with frequent overload and traffic jams, greatly affecting the socio-economic development of the region. Increasing investment in traffic routes connecting Ho Chi Minh City and Dong Nai province will solve the problem of traffic congestion and overload on National Highway 1.

The investment in the construction of Cat Lai bridge will connect Cat Lai ward, Ho Chi Minh City and Dai Phuoc commune, Dong Nai province, reduce traffic pressure for Cat Lai ferry (often overloaded) and develop the economy of Dai Phuoc commune, Dong Nai province; at the same time, solve the need for traffic connection between Ho Chi Minh City and Ba Ria - Vung Tau province (now Ho Chi Minh City).

Hien trang pha Cat Lai, vi tri xay dung cau Cat Lai. Anh tu lieu: HAC
Current status of Cat Lai ferry, location of Cat Lai bridge construction. Documentary photo: HAC
Pha Cat Lai noi Dong Nai va TPHCM. Anh tu lieu: HAC
Cat Lai ferry connects Dong Nai and Ho Chi Minh City. Documentary photo: HAC
Pha Cat Lai noi Dong Nai va TPHCM. Anh tu lieu: HAC
Cat Lai ferry connects Dong Nai and Ho Chi Minh City. Documentary photo: HAC
Pha Cat Lai noi Dong Nai va TPHCM. Anh tu lieu: HAC
Cat Lai ferry connects Dong Nai and Ho Chi Minh City. Documentary photo: HAC
HÀ ANH CHIẾN
RELATED NEWS

HCMC prepares to widen the eastern road to 60m, 10 - 12 lanes connecting Cat Lai bridge

|

HCMC - Nguyen Thi Dinh Street from My Thuy intersection to Cat Lai ferry will be expanded to 60 m, 10 - 12 lanes, synchronously connecting with Cat Lai bridge under construction.

Dong Nai assigns Construction Corporation No. 1 - JSC to propose the Cat Lai bridge project connecting Ho Chi Minh City

|

Dong Nai - Chairman of the Provincial People's Committee assigned Construction Corporation No. 1 - JSC as the investor to propose the Cat Lai bridge and access road project...

Dong Nai will start construction of Cat Lai bridge in 2026 and exploit it in 2028

|

Dong Nai - The Provincial People's Committee listens to the Construction Corporation No. 1 (CC1) propose investment projects to build Cat Lai Bridge and Long Hung Bridge connecting to Ho Chi Minh City.

Hung Yen kumquat garden enters peak season to serve Lunar New Year

|

Hung Yen - These days, kumquat gardens in Hoan Long commune are entering peak care and sale, attracting buyers from many localities.

Germany declares Trump has crossed the red line in the Greenland case

|

Germany believes that the US President's request to annex Greenland is an act of "extortion", and calls on the EU to activate an economic coercion mechanism in response.

Stocks maintain green color thanks to bluechip stocks

|

The recovery of bluechip stocks and the banking group helped the stock market increase sharply, returning to conquer the 1,900-point mark.

Hanoi adjusts the overall planning of the Red River urban subdivision

|

Hanoi - The Red River urban sub-area will serve the needs of resettlement and relocation for about 50,000 people.

Top provinces and cities leading the national excellent student exam in the 2025-2026 school year

|

Ho Chi Minh City, Ninh Binh, Phu Tho rose to lead the country in the number of prizes in the national excellent student exam for the 2025-2026 school year. Hanoi ranked 5th.

HCMC prepares to widen the eastern road to 60m, 10 - 12 lanes connecting Cat Lai bridge

MINH QUÂN |

HCMC - Nguyen Thi Dinh Street from My Thuy intersection to Cat Lai ferry will be expanded to 60 m, 10 - 12 lanes, synchronously connecting with Cat Lai bridge under construction.

Dong Nai assigns Construction Corporation No. 1 - JSC to propose the Cat Lai bridge project connecting Ho Chi Minh City

HÀ ANH CHIẾN |

Dong Nai - Chairman of the Provincial People's Committee assigned Construction Corporation No. 1 - JSC as the investor to propose the Cat Lai bridge and access road project...

Dong Nai will start construction of Cat Lai bridge in 2026 and exploit it in 2028

HÀ ANH CHIẾN |

Dong Nai - The Provincial People's Committee listens to the Construction Corporation No. 1 (CC1) propose investment projects to build Cat Lai Bridge and Long Hung Bridge connecting to Ho Chi Minh City.