Rach Mieu Bridge is locally congested, vehicles are coming in after each other

Thành Nhân |

Ben Tre - At around 3:00 p.m. on April 29, local traffic congestion occurred at Rach Mieu Bridge.

According to the reporter of Lao Dong Newspaper, at around 3:00 p.m. on April 29, the traffic volume from Ho Chi Minh City to Ben Tre province through Rach Mieu Bridge and vice versa increased, causing local traffic congestion.

In this situation, the Traffic Police (CSGT) of Tien Giang and Ben Tre provinces coordinated to regulate.

An officer of the Traffic Police Department of Tien Giang Provincial Police said that the traffic police forces of Tien Giang and Ben Tre provinces are coordinating and sending forces to be on duty on both sides of Rach Mieu Bridge.

Accordingly, if the traffic congestion on the Tien Giang bank continues, the Traffic Police of Ben Tre Province will block vehicles from the direction of Ben Tre Province to give way to vehicles from My Tho City to move through Rach Mieu Bridge and vice versa to regulate traffic at this section.

Here are some images of traffic congestion at Rach Mieu Bridge:

Cac phuong lien luu thong tu huong TP Ho Chi Minh ve Ben Tre tang cao nen da xay canh un u giao thong cuc bo. Anh: Thanh Nhan
Vehicles traveling from Ho Chi Minh City to Ben Tre increased, causing local traffic congestion. Photo: Thanh Nhan
Cac phuong tien noi duoi de nhich tung chut mot de lan luot qua cau Rach Mieu. Anh: Thanh Nhan
Vehicles lined up to move in little by little to cross Rach Mieu Bridge. Photo: Thanh Nhan
Cau Rach Mieu xay ra canh un u giao thong nen keo dai khien duong tinh 864 cung xay ra canh un u keo dai. Anh: Thanh Nhan
Rach Mieu Bridge experienced traffic congestion and caused prolonged congestion on Provincial Road 864. Photo: Thanh Nhan

National Highway 60 starts from Trung Luong intersection (My Tho city, Tien Giang province) passes through Ben Tre and Tra Vinh provinces and ends in Soc Trang city (Soc Trang province) with a length of about 115km. Because this route is much shorter than National Highway 1, vehicles traveling from Soc Trang City to Ho Chi Minh City or vice versa are given priority, causing traffic density on National Highway 60 to increase.

Meanwhile, when vehicles go to Rach Mieu Bridge (connecting Tien Giang and Ben Tre) is narrow, making it considered a "bottleneck", local traffic congestion often occurs.

Thành Nhân
RELATED NEWS

About 350 workers will construct Rach Mieu 2 Bridge through the April 30 ceremony

|

Ben Tre - About 350 workers will work on the construction of Rach Mieu 2 bridge during the April 30, 2025 holiday.

Rach Mieu Bridge is congested, waiting for Rach Mieu 2 Bridge

|

Ben Tre - Rach Mieu Bridge often occurs congestion, Rach Mieu 2 bridge is expected to reduce traffic pressure for the existing bridge.

Wearily waiting for the handover of the resettlement land for the Rach Mieu 2 bridge project

|

Tien Giang - Many households in Tien Giang affected by the Rach Mieu 2 bridge project have not yet received resettlement land.

Military Region 5 proposes the Ministry of National Defense to be ready with helicopters to rescue people in flooded areas

|

Major General Tran Thanh Hai, Deputy Commander of Military Region 5, met with the frontline command in Dak Lak, proposing that the Ministry of National Defense be ready with helicopters to rescue people in flooded areas.

Huong Giang's ability before the Miss Universe 2025 final

|

Before the Miss Universe 2025 final, the representative of Vietnam - Miss Huong Giang is still highly appreciated. However, the possibility of her coronation is very difficult.

Worried about drug resistance, many parents refuse to buy antibiotics for their children

|

Hanoi - Instead of rushing to signal to buy antibiotics every time their child coughs or has a runny nose, more and more parents are increasingly aware of the risk of drug abuse.

Hundreds of billion-dollar cars in the center of Nha Trang submerged in floodwaters

|

Khanh Hoa - Floods rose rapidly at night, causing hundreds of cars parked in the Go supermarket area, Tay Nha Trang ward, to be deeply submerged in water.

About 350 workers will construct Rach Mieu 2 Bridge through the April 30 ceremony

Thành Nhân |

Ben Tre - About 350 workers will work on the construction of Rach Mieu 2 bridge during the April 30, 2025 holiday.

Rach Mieu Bridge is congested, waiting for Rach Mieu 2 Bridge

Thành Nhân |

Ben Tre - Rach Mieu Bridge often occurs congestion, Rach Mieu 2 bridge is expected to reduce traffic pressure for the existing bridge.

Wearily waiting for the handover of the resettlement land for the Rach Mieu 2 bridge project

Thành Nhân |

Tien Giang - Many households in Tien Giang affected by the Rach Mieu 2 bridge project have not yet received resettlement land.