Details of 28 stations in the North-South high-speed railway project

Xuyên Đông |

The North-South high-speed railway project will pass through 20 provinces with 23 passenger stations and 5 freight stations.

According to the Pre-Feasibility Study Report of the North-South High-Speed ​​Railway Project, the project will pass through 20 provinces with 23 passenger stations and 5 freight stations, details as follows:

Within Hanoi, the route from Ngoc Hoi station basically follows the planning corridor. At the end of Phu Xuyen district, the proposed route splits to the East to avoid Dong Van industrial park in Duy Tien district, Ha Nam province.

Next, the route crosses National Highway 1, the current railway goes east of the expressway to Phu Ly City. Phu Ly Station is located in Liem Tuyen and Liem Tiet communes, Phu Ly City, near the Liem Tuyen junction, east of the North-South expressway.

From Phu Ly station, the basic route follows the current railway and National Highway 21 towards Nam Dinh city. Nam Dinh station is located in My Hung commune, My Loc district (near Dang Xa current railway station).

After Nam Dinh station, the route goes towards Ninh Binh, crossing the Day River in the eastern area of ​​Khanh Phu Industrial Park (Ninh Binh City). After intersecting with National Highway 10, the route runs parallel to the east of the expressway.

Ninh Binh station is located in Khanh Thuong commune, Yen Mo district, about 1km east of Mai Son intersection, 7.5km south of Ninh Binh city center and Ninh Binh station on the current railway line.

Next, the route goes straight to the South, crosses Yen Thang Lake, avoids Dong Thai Lake eco-tourism area, then goes through the mountain through Tam Diep tunnel into Thanh Hoa province.

From Tam Diep mountain area, the basic route goes south, turns to the west of National Highway 1A in Ha Trung area, crosses Ma River at a location about 4.3km upstream from Ham Rong bridge. Thanh Hoa station is located in the west of Thanh Hoa city.

Next, the basic route runs parallel to the East of the highway, through Yen My lake area, to Nghi Son economic zone. This is where the planned station is expected to be located.

The route crosses Mong Ga mountain into Nghe An province. Next, the basic route runs parallel to the east of the expressway, through Cau Giat area, the route tends to go near the current railway, crosses Than Vu mountain, and goes to the west of Vinh bypass.

Vinh Station is located between the expressway and the current Vinh bypass. The route then crosses the Lam River and enters Ha Tinh province.

From Hong Linh to Ha Tinh City, the route runs parallel to and about 2-3km west of National Highway 1. Ha Tinh Station is located in the western part of the city, on Ham Nghi Street connecting to the city center. Then the route basically follows the highway corridor towards Vung Ang.

Vung Ang - Ha Tinh Station is located in Ky Hoa commune, near Ky Anh bypass. At this location, there is a branch connecting to the freight station located in Vung Ang economic zone. Then, the line crosses the Hoanh Son range and enters Quang Binh province.

From Hoanh Son mountain, the route goes south, along Vuc Tron lake, almost parallel to the highway route, avoiding Con Se location, crossing Gianh river at a location about 5km upstream from the current Gianh bridge, the route goes to the west of Dong Hoi city.

Dong Hoi Station is located in Nghia Ninh Commune, Dong Hoi City, about 4.58km southwest of Dong Hoi City center (or Ly Trach Commune, Bo Trach District, about 9.35km northwest of the city center). The route crosses Nhat Le River at a location about 1.3km upstream from Nhat Le Bridge of National Highway 1.

The route then goes south, crosses Kien Giang River at a location about 1.8km west of Trung Quan Bridge, crosses the existing railway and Provincial Road 16, passes through sparsely populated areas and agricultural land and low hills of Quang Ninh and Le Thuy districts to Quang Tri province.

From the Quang Binh - Quang Tri border, the basic route runs parallel to the expressway, going west of the large lake systems (Bao Dai, La Nga, Kinh Mon...), approaching Dong Ha Station located in the west of Dong Ha city (near Dien Bien Phu street).

Next, the route goes straight to the South, crossing the Thach Han River about 3.5km upstream from the current railway bridge, the route is about 2km west of La Vang holy land, crossing the O Lau River to Thua Thien Hue province.

The route continues to connect the West of Quang Tri province. After passing Hai Lang station, the route turns left, crosses the North-South railway, crosses National Highway 1, reaches Phong Hoa commune (Thua Thien Hue), passes between the boundary of the existing Phong Dien Industrial Park and the planned expansion of Phong Dien Industrial Park.

The route crosses the Huong River to Phu Vang district, cuts through the commercial project combined with the wharf of Phu Thanh commune, Pho An park area, cuts through areas C, D, E of the new urban area of ​​An Van Duong, cuts through Phu My commune, goes through Phu Ho and Phu Luong communes, cuts through the planning area of ​​Phu Da town, goes through Phu Gia and Vinh Ha communes. Hue station is located in Phu My commune, Phu Vang district, Thua Thien Hue province.

The route passes through Cau Hai lagoon area, crosses National Highway 49B into Chan May economic zone, turns right across National Highway 1 and the current railway, crosses Hai Van pass to Da Nang city.

In Da Nang City, after passing Hai Van Pass, the route follows the Cu De River basin, along the corridor, running parallel to the East of the expressway. Hoa Vang Station is located in Hoa Son Commune, Hoa Vang District, Da Nang City, the northern area of ​​the intersection between Ba Na - Suoi Mo Road and the expressway.

After the Da Nang station area, the route still follows the expressway, passing between the expressway and the existing railway to Quang Nam province.

In the Da Nang - Tam Ky section, the route runs almost parallel to the East of the current railway and highway. Tam Ky Station is located in the West, near the Tam Ky City bypass.

In Quang Nam province, Chu Lai Cargo Station is located in the border area of ​​Tam Hiep commune and Tam My Tay commune, Nui Thanh district, Quang Nam province near DT.617 road. This station will serve to connect with Chu Lai Airport area, Ky Ha and Dung Quat seaports.

The basic route then goes west of the expressway, through Doc Soi area into Quang Ngai province. Next, the route continues to follow the current expressway towards Quang Ngai city. Quang Ngai station is located in the western part of the city, near Hoang Hoa Tham street.

From Quang Ngai station, the line runs basically parallel to the west of the current railway in Nghia Hanh district, crossing the Ve River at a location about 2km upstream from the Ve River bridge of the current railway.

Within Mo Duc and Duc Pho districts, the route runs between the existing railway and the highway. At the end of Duc Pho town, the route crosses the highway, goes west over Binh De pass and into Binh Dinh province.

From the border with Binh Dinh province, the route goes along the west corridor of the expressway to Bong Son station, located in Hoai Tan commune and Bong Son town, Hoai Nhon district. Then the railway crosses the expressway, heading towards Quy Nhon city.

Dieu Tri station is located in Phuoc An commune, Tuy Phuoc district, then crosses Cu Mong pass to Phu Yen province. The route continues west of the highway, to Song Cau town, the route goes east of the highway.

Arriving at Tuy Hoa City, there are two options for the route to the central area and to bypass the west of the city. The option to go to the west of the city is chosen, Tuy Hoa station is located in Hoa Thanh commune, Dong Hoa town, about 4.2km west of the airport. Then the route goes along the same corridor as the highway, crossing Ca Pass to Khanh Hoa province.

From the border with Phu Yen province, the route passes through the Ca Pass and Co Ma areas, heading west of National Highway 1A and the current railway. Dien Khanh station is located in Dien Thanh commune, Dien Khanh district, near National Highway 27C, about 11km west of Nha Trang city center.

Van Phong cargo station is located in Ninh An commune, Ninh Hoa town to ensure synchronization and suitability with the development orientation of Van Phong economic zone.

The route then shares the same corridor with the Cam Lam - Vinh Hao expressway, entering Ninh Thuan province. The route basically runs in the corridor between National Highway 1A, the existing railway and the expressway. Passing Phan Rang - Thap Cham city, the route runs parallel to the East and is about 2km from the existing railway. Thap Cham station is located in Phuoc My ward, Phan Rang - Thap Cham city, near the intersection of National Highway 27.

Then, the route goes south, through Ca Na area into Binh Thuan province. From Ca Na area, the route basically goes along the eastern corridor of the expressway, going to Phan Ri station located in Phan Hoa commune, Bac Binh district, about 5 km from Phan Ri Cua town center.

Next, the route crosses the Luy River, goes to the North of Binh Tan Solar Power Project 1, 2, goes to the West of Ta Zon Mountain, goes parallel to the East of the current railway to Muong Man Station in Muong Man Commune, Ham Thuan Nam District, located about 0.4km from the current Muong Man Station, about 13.2km from the center of Phan Thiet City.

Next, the line runs parallel to the East of the current railway, north of Tan Minh town, through the North of Tan Duc industrial park and towards Dong Nai province.

In Dong Nai province, the route basically shares the same corridor to the East of the Phan Thiet - Dau Giay expressway.

Arriving at Cam My district, the route turns left to enter the central axis of Long Thanh international airport, and arranges an additional right turn along Ring Road 4 to the North to connect with Trang Bom Cargo Station to serve cargo transit. Long Thanh passenger station is located in the central area of ​​the airport in Binh Son commune, Long Thanh district.

The route then goes south, along the Ho Chi Minh City - Long Thanh - Dau Giay expressway corridor to Thu Thiem Station, the final station of the project.

Xuyên Đông
TIN LIÊN QUAN

Giá trị lan tỏa từ dự án đường sắt cao tốc Bắc - Nam

Xuyên Đông |

Dự án đường sắt cao tốc sẽ góp phần tăng cường kết nối vùng, miền, các cực tăng trưởng, tạo động lực lan tỏa, mở ra không gian phát triển kinh tế mới...

Thông tin chính thức về tiến độ đường sắt cao tốc Bắc - Nam

Xuyên Đông |

Chiều 1.10, Bộ Giao thông Vận tải tổ chức cuộc trao đổi thông tin với báo chí về chủ trương đầu tư dự án đường sắt cao tốc Bắc - Nam.

Đường sắt cao tốc Bắc - Nam dự kiến hoàn thành năm 2035

Xuyên Đông |

Trong báo cáo mới đây của Bộ Giao thông Vận tải, Việt Nam phấn đấu hoàn thành đầu tư toàn tuyến đường sắt cao tốc Bắc - Nam trong năm 2035.

Cựu công an bị cáo buộc gây cản trở điều tra vụ chuyến bay

Việt Dũng |

Biết người quen liên quan đến vụ chuyến bay giải cứu, ông Nguyễn Xuân Thông vừa bày cách cho ông này khai báo gian dối, vừa che giấu hành vi phạm tội.

Gia Lai cho thuê khu đất công gần 25.000m2 không qua đấu giá

THANH TUẤN |

Gia Lai – Khu đất công cho thuê có diện tích gần 25.000m2 hiện đang là trường học tiêu chuẩn Quốc tế vừa được Thanh tra Chính phủ xác định có nhiều sai phạm.

Côn đồ đánh gãy xương sườn, tay, chân của ngư dân Hải Phòng

Đại An |

Hải Phòng – Trong lúc đang khai thác ngao ở khu vực ven biển ở Đồ Sơn (Hải Phòng), 2 bố con ông Ph. bị nhiều đối tượng hành hung, gây thương tích nghiêm trọng.

Phà Phong Châu hoạt động hết công suất

Tô Công |

Phú Thọ - Phà Phong Châu đang hoạt động hết công suất phục vụ nhu cầu đi lại của người dân huyện Tam Nông và Lâm Thao.

Jiyeon (T-ara) và chồng cầu thủ ly hôn sau 2 năm kết hôn

DƯƠNG HƯƠNG |

Ngày 5.10, truyền thông Hàn Quốc đưa tin, nữ ca sĩ kiêm diễn viên Jiyeon (T-ara) và cầu thủ bóng chày Hwang Jae Gyun đã nộp đơn ly hôn sau 2 năm kết hôn.

The spillover value of the North-South high-speed railway project

Xuyên Đông |

The high-speed railway project will contribute to strengthening regional connectivity, growth poles, creating spillover momentum, opening up new economic development space...

Official information on the progress of the North-South high-speed railway

Xuyên Đông |

On the afternoon of October 1, the Ministry of Transport held an information exchange with the press about the investment policy for the North-South high-speed railway project.

North-South high-speed railway expected to be completed in 2035

Xuyên Đông |

In a recent report by the Ministry of Transport, Vietnam strives to complete investment in the entire North-South high-speed railway route by 2035.