Hanoi Chairman orders inspection of illegal dumping of waste encroaching on the Red River

KHÁNH AN |

Hanoi - The Chairman of the City People's Committee directed the inspection and handling of press information reflecting the situation of illegal dumping of waste encroaching on the Red River through Lien Ha commune (Dan Phuong).

The Hanoi People's Committee has just issued an official dispatch on checking press information reflecting the situation of illegal dumping of waste encroaching on the Red River through Lien Ha commune, Dan Phuong district, turning this area into a construction material storage area. This not only pollutes the environment, but this landfill also affects natural flow, increasing the risk of riverbank erosion and potential flooding, especially during the rainy season.

Regarding this, Chairman of Hanoi People's Committee Tran Sy Thanh assigned Dan Phuong District People's Committee to preside over and coordinate with relevant units to urgently inspect and clarify the information reported by the press, strictly handle violations (if any); report to the City People's Committee before April 11.

Previously, the press reported that the Red River section flowing through Lien Ha commune (Dan Phuong district, Hanoi city) is struggling with illegal dumping of waste. Recorded in the waste collection area of several thousand square meters along the river.

The existence of this landfill along with some other waste sources appearing right at the source of the Red River Surface Water Plant Pumping Station - which will provide clean water to millions of Hanoians - has left many doubts about the water source and ecosystem around the Clean Water Plant project.

At the landfill, concrete, broken bricks, plastic bags, sacks... buried deep at the edge of the water every day encroach on the river like oil spots swallowing up the entire large riverbed. Not only construction waste, but also household waste is illegally dumped, turning the landscape of the green, peaceful riverside into a messy place.

Local people said that this situation has started for about a month now and is still continuing with a series of trucks continuously carrying waste to dump every day.

KHÁNH AN
RELATED NEWS

Proposal to start construction of 3 bridges across the Red River in Hanoi

|

Hanoi - The City People's Committee has just sent an official dispatch to the Prime Minister proposing the time to start construction of 3 Red River overpasses: Tu Lien, Tran Hung Dao, Ngoc Hoi.

Bringing the Red River water into the To Lich River along Vo Chi Cong Street

|

Hanoi - The Chairman of the City People's Committee assigned the Department of Construction to study a plan to supplement water from the Red River to the To Lich River along Vo Chi Cong Street.

Hanoi Chairman gives urgent instructions on the progress of building 3 "super requirements" to cross the Red River

|

Hanoi leaders are determined to start construction of Tu Lien Bridge on May 19, Tran Hung Dao Bridge according to the progress of Tu Lien Bridge and Ngoc Hoi Bridge after the investor is approved.

G-Dragon finalizes concert schedule in Hanoi

|

The information just announced by G-Dragon has made the fan community in Vietnam " restless".

Poland sends 40,000 troops closer to the border, tensions in Eastern Europe rise to alert level

|

Poland has sent 40,000 troops closer to the border as Russia and Belarus conduct a Zapad 2025 drill, pushing tensions in Eastern Europe to an alarming level.

Da Nang plans to have a Secretary of the City Party Committee and five Deputy Secretaries for the 2025-2030 term

|

Da Nang - 75 members are expected to join the Da Nang Party Executive Committee for the 2025-2030 term, of which 73 are re-elected.

Proposal to start construction of 3 bridges across the Red River in Hanoi

kHÁNH AN |

Hanoi - The City People's Committee has just sent an official dispatch to the Prime Minister proposing the time to start construction of 3 Red River overpasses: Tu Lien, Tran Hung Dao, Ngoc Hoi.

Bringing the Red River water into the To Lich River along Vo Chi Cong Street

KHÁNH AN |

Hanoi - The Chairman of the City People's Committee assigned the Department of Construction to study a plan to supplement water from the Red River to the To Lich River along Vo Chi Cong Street.

Hanoi Chairman gives urgent instructions on the progress of building 3 "super requirements" to cross the Red River

Anh Tuấn |

Hanoi leaders are determined to start construction of Tu Lien Bridge on May 19, Tran Hung Dao Bridge according to the progress of Tu Lien Bridge and Ngoc Hoi Bridge after the investor is approved.