Remove the famous muddy road in Dong Nai from the BOT project

HÀ ANH CHIẾN |

The Thien Tan Water Plant route (Hoang Van Bon) was removed from the BOT road 768 project by the Dong Nai Provincial People's Committee, and the Department of Transport banned trucks for repairs.

The road famous for many "potholes" in Dong Nai

On October 13, the Department of Transport of Dong Nai province announced traffic organization on the Thien Tan Water Plant (Hoang Van Bon) route from Minh Nguyet intersection to National Highway 1.

According to the Department of Transport of Dong Nai province, the Thien Tan Water Plant (Hoang Van Bon) route is a part of the BOT project of Road 768, implemented by Sonadezi Chau Duc Joint Stock Company as the investor.

This route was invested and put into use in 1999, with a road surface width of 6m, dirt sidewalks on each side 1.5m wide, roadbed width 9.0m, no drainage system along both sides of the road.

Because the road was invested in a long time ago and does not have a drainage system, it has now seriously degraded, with many severely damaged areas, especially the section from Minh Nguyet intersection to National Highway 1.

Tuyen duong Nha may nuoc Thien Tan (Hoang Van Bon) nhieu o ga, o voi. Anh tu lieu: HAC
Thien Tan Water Plant Road (Hoang Van Bon) is seriously degraded. Photo: HAC

Currently, the Thien Tan Water Plant route has been removed from the BOT Road 768 project by the Dong Nai Provincial People's Committee and assigned to the Department of Transport to repair, invest in upgrading and expand with budget capital.

Traffic accident resulting in death

On October 11, 2024, the National Assembly Delegation of Dong Nai province organized a supervision of the implementation of policies and laws on investment, construction of key works and projects of the province and investment in the exploitation of traffic works under the form of Build - Operate - Transfer (BOT) contracts.

In particular, the National Assembly Delegation of Dong Nai province inspected the site of Thien Tan Water Plant (Hoang Van Bon) and noted that the road is currently seriously degraded, with many severely damaged locations, especially the section from Minh Nguyet intersection to National Highway 1. Recently, this road section has had many serious traffic accidents leading to deaths.

Tuyen duong Nha may nuoc Thien Tan (Hoang Van Bon) nguy co gay mat an toan giao thong. Anh tu lieu: HAC
Thien Tan Water Plant Road (Hoang Van Bon) is at risk of causing traffic insecurity. Photo: HAC

According to records, on October 2, on Thien Tan Street (Thien Tan Commune, Vinh Cuu District), a collision occurred between a dump truck and a motorbike, causing the woman riding the motorbike to fall onto the road and die on the spot.

Previously, on September 15, on Hoang Van Bon Street (Tan Bien Ward, Bien Hoa City), a collision occurred between two people on motorbikes, causing 1 woman and 1 teenager to die on the spot.

To ensure traffic safety for people and vehicles participating in traffic as well as to avoid serious accidents like in the past, the National Assembly Delegation of Dong Nai province has requested the People's Committee of Dong Nai province to direct specialized units to reorganize traffic plans, prohibiting vehicles with a load capacity of 5 tons or more from traveling on the Thien Tan Water Plant route from Minh Nguyet intersection to National Highway 1 from 6:00 a.m. to 8:00 p.m. until this route is repaired.

The Department of Transport announces traffic organization on the Thien Tan Water Plant route from Minh Nguyet intersection to National Highway 1 as follows:

Prohibit vehicles with a load capacity of 5 tons or more from circulating from 6:00 a.m. to 8:00 p.m. on Thien Tan Water Plant route from Minh Nguyet intersection to National Highway 1.

Applicable period starts from 21/10/2024.

HÀ ANH CHIẾN
RELATED NEWS

Secretary of the Hanoi Party Committee receives new duties

|

Hanoi established 2 steering committees to remove institutional and planning obstacles headed by Politburo member and City Party Secretary Nguyen Duy Ngoc.

Can Tho Oncology Hospital project increases capital by 344 billion VND, expected to be re-constructed by the end of the year

|

Can Tho - After adjustment, the 500-bed Oncology Hospital Project increased the investment to 344 billion VND compared to before; construction is expected to resume at the end of this year.

Lam Dong traffic police rescue 20 people trapped in Khanh Le Pass

|

Lam Dong - By 5:00 p.m. this afternoon, the Traffic Police had approached and rescued 20 people and 7 vehicles trapped in the middle of Khanh Le Pass.

Mr. Vo Trong Hai was elected to hold the position of Chairman of Nghe An Provincial People's Committee

|

Nghe An Mr. Vo Trong Hai, Deputy Secretary of the Provincial Party Committee, was elected to hold the position of Chairman of the People's Committee of Nghe An province.

Hue residents are tired of leaving as floods build up

|

HUE - 4 consecutive major floods, people in Hue have just moved out and the flood has recurred, everyone is tired and left.

Yang Mao commune in Dak Lak uses ropes to evacuate 200 people from flooded areas

|

Dak Lak - The authorities have used ropes to mobilize people in isolated flooded areas to safety.

No violations of Mailisa cosmetics have been detected, the Ministry of Health still warns of risks

|

Although there are no reports of violations with the cosmetics used by the Mailisa beauty salon, while waiting for the test results, the Drug Administration recommends that people be cautious when using the product.

Male doctor in Lam Dong died in a private house suspected of being injected with suicide

|

Lam Dong - The male doctor was found dead by his family in his private home, next to many bottles of medicine that were used suspected to be from suicide.

BOT toll station in Dong Nai province is about to resume operation

HÀ ANH CHIẾN |

Dong Nai - It is expected that from December 1, the BOT toll station on provincial road 768 will resume operation after a period of suspension.

50 billion VND to "rescue" the vital road connecting 2 Southeast provinces

HÀ ANH CHIẾN - NHƯ QUỲNH |

National Highway 51, over 80 km long, is the main route connecting Dong Nai province with Ba Ria - Vung Tau province and is seriously damaged, full of potholes...

Con đường kết nối các khu cụm công nghiệp ở Đồng Nai bị cày nát

HÀ ANH CHIẾN |

Đồng Nai – Theo ghi nhận của phóng viên báo Lao Động, tuyến đường Phan Đăng Lưu (thuộc phường Long Bình và phường Phước Tân, TP Biên Hòa) dài gần 2 km nhưng có vai trò quan trọng khi kết nối nhiều khu, cụm công nghiệp trên địa bàn TP Biên Hòa, huyện Trảng Bom. Tuy nhiên, tuyến đường này thời gian qua đã bị cày nát, đất đá lởm khởm...