Remove the famous muddy road in Dong Nai from the BOT project

HÀ ANH CHIẾN |

The Thien Tan Water Plant route (Hoang Van Bon) was removed from the BOT road 768 project by the Dong Nai Provincial People's Committee, and the Department of Transport banned trucks for repairs.

The road famous for many "potholes" in Dong Nai

On October 13, the Department of Transport of Dong Nai province announced traffic organization on the Thien Tan Water Plant (Hoang Van Bon) route from Minh Nguyet intersection to National Highway 1.

According to the Department of Transport of Dong Nai province, the Thien Tan Water Plant (Hoang Van Bon) route is a part of the BOT project of Road 768, implemented by Sonadezi Chau Duc Joint Stock Company as the investor.

This route was invested and put into use in 1999, with a road surface width of 6m, dirt sidewalks on each side 1.5m wide, roadbed width 9.0m, no drainage system along both sides of the road.

Because the road was invested in a long time ago and does not have a drainage system, it has now seriously degraded, with many severely damaged areas, especially the section from Minh Nguyet intersection to National Highway 1.

Tuyen duong Nha may nuoc Thien Tan (Hoang Van Bon) nhieu o ga, o voi. Anh tu lieu: HAC
Thien Tan Water Plant Road (Hoang Van Bon) is seriously degraded. Photo: HAC

Currently, the Thien Tan Water Plant route has been removed from the BOT Road 768 project by the Dong Nai Provincial People's Committee and assigned to the Department of Transport to repair, invest in upgrading and expand with budget capital.

Traffic accident resulting in death

On October 11, 2024, the National Assembly Delegation of Dong Nai province organized a supervision of the implementation of policies and laws on investment, construction of key works and projects of the province and investment in the exploitation of traffic works under the form of Build - Operate - Transfer (BOT) contracts.

In particular, the National Assembly Delegation of Dong Nai province inspected the site of Thien Tan Water Plant (Hoang Van Bon) and noted that the road is currently seriously degraded, with many severely damaged locations, especially the section from Minh Nguyet intersection to National Highway 1. Recently, this road section has had many serious traffic accidents leading to deaths.

Tuyen duong Nha may nuoc Thien Tan (Hoang Van Bon) nguy co gay mat an toan giao thong. Anh tu lieu: HAC
Thien Tan Water Plant Road (Hoang Van Bon) is at risk of causing traffic insecurity. Photo: HAC

According to records, on October 2, on Thien Tan Street (Thien Tan Commune, Vinh Cuu District), a collision occurred between a dump truck and a motorbike, causing the woman riding the motorbike to fall onto the road and die on the spot.

Previously, on September 15, on Hoang Van Bon Street (Tan Bien Ward, Bien Hoa City), a collision occurred between two people on motorbikes, causing 1 woman and 1 teenager to die on the spot.

To ensure traffic safety for people and vehicles participating in traffic as well as to avoid serious accidents like in the past, the National Assembly Delegation of Dong Nai province has requested the People's Committee of Dong Nai province to direct specialized units to reorganize traffic plans, prohibiting vehicles with a load capacity of 5 tons or more from traveling on the Thien Tan Water Plant route from Minh Nguyet intersection to National Highway 1 from 6:00 a.m. to 8:00 p.m. until this route is repaired.

The Department of Transport announces traffic organization on the Thien Tan Water Plant route from Minh Nguyet intersection to National Highway 1 as follows:

Prohibit vehicles with a load capacity of 5 tons or more from circulating from 6:00 a.m. to 8:00 p.m. on Thien Tan Water Plant route from Minh Nguyet intersection to National Highway 1.

Applicable period starts from 21/10/2024.

HÀ ANH CHIẾN
RELATED NEWS

Mr. Zelensky hinted at the real problem behind Druzhba's restoration

|

Mr. Zelensky said that the restoration of the Druzhba pipeline means easing sanctions against Russia.

Accelerate completion of Ring Road 2.5 section Kim Dong - Dam Hong before handover date

|

Hanoi - Ring Road 2.5 Kim Dong - Dam Hong section gradually reveals a new face when the final items are being urgently constructed before the handover time.

Rumors spread that Iran's Supreme Leader secretly went abroad for treatment

|

Iranian Supreme Leader Mojtaba Khamenei is believed to have been injured in the airstrike on February 28 and may have been taken abroad for treatment.

Vinh Long Trade Union social housing reaches about 20% of volume, efforts to overcome difficulties in construction

|

Vinh Long - The Trade Union social housing project in Giao Long commune reached about 20% of the volume, overcoming construction difficulties, ensuring completion progress according to plan.

Passenger cars stop and park illegally to wait for time to enter the inner city, many drivers are fined

|

Hanoi - Some passenger cars are parked on gateway roads of Hanoi to wait for time to enter the inner city but not in the prescribed places, causing traffic obstruction.

BOT toll station in Dong Nai province is about to resume operation

HÀ ANH CHIẾN |

Dong Nai - It is expected that from December 1, the BOT toll station on provincial road 768 will resume operation after a period of suspension.

50 billion VND to "rescue" the vital road connecting 2 Southeast provinces

HÀ ANH CHIẾN - NHƯ QUỲNH |

National Highway 51, over 80 km long, is the main route connecting Dong Nai province with Ba Ria - Vung Tau province and is seriously damaged, full of potholes...

Con đường kết nối các khu cụm công nghiệp ở Đồng Nai bị cày nát

HÀ ANH CHIẾN |

Đồng Nai – Theo ghi nhận của phóng viên báo Lao Động, tuyến đường Phan Đăng Lưu (thuộc phường Long Bình và phường Phước Tân, TP Biên Hòa) dài gần 2 km nhưng có vai trò quan trọng khi kết nối nhiều khu, cụm công nghiệp trên địa bàn TP Biên Hòa, huyện Trảng Bom. Tuy nhiên, tuyến đường này thời gian qua đã bị cày nát, đất đá lởm khởm...