The highest ticket price for the Bac Giang - Lang Son highway is over 450,000 VND

Khánh Linh |

The ticket price for the Bac Giang - Lang Son expressway at the Voi town intersection is up to 454,000 VND/trip for overweight trucks.

On January 21, according to Lao Dong, the People's Committee of Lang Son province announced the road service fee at the Voi town interchange toll station (Km102) on the Bac Giang - Lang Son expressway. This decision is based on Decision No. 264/QD-UBND dated February 12, 2020 and the proposal of the Bac Giang - Lang Son BOT Joint Stock Company.

Accordingly, vehicles with less than 12 seats, trucks under 2 tons and public buses range from 15,000 VND to 118,000 VND/trip.

Vehicles with 12 to 30 seats, load capacity from 2 to under 4 tons, from 21,000 VND to 168,000 VND/trip.

Vehicles with more than 31 seats and a load capacity of 4 to under 10 tons range from VND 26,000 to VND 207,000/trip.

Trucks from 10 to under 18 tons, 20-foot containers from 44,000 VND to 336,000 VND/trip.

Trucks from 18 tons and up, 40-foot containers from 59,000 VND to 454,000 VND/trip.

a
Road service fee at the toll station at the Voi town interchange (Km102) on the Bac Giang - Lang Son expressway. Screenshot

Bac Giang - Lang Son BOT Joint Stock Company will publicly post ticket prices and widely announce them on the media. Authorities are assigned to supervise toll collection to ensure transparency and compliance with regulations.

The Bac Giang - Lang Son Expressway is an important part of the Eastern North - South Expressway system, connecting the two provinces of Bac Giang and Lang Son.

This route has a total length of about 64 km, starting from Km45+100 in Mai Sao commune, Chi Lang district, Lang Son province, and ending at Km108+500, connecting with National Highway 1, Hanoi - Bac Giang section.

Designed with a 25 m wide road surface, this highway includes 4 lanes and 2 emergency lanes, allowing a design speed of up to 100 km/h.

The project is implemented under the BOT contract form, with a total investment of about 12,188 billion VND. The technical opening took place on September 29, 2019, and officially put into operation from January 15, 2020.

Currently, the project is being expanded with a 43 km long Huu Nghi - Chi Lang expressway section, aiming to connect from Huu Nghi border gate to Chi Lang district, completing the expressway from Hanoi to the international border gate, creating favorable conditions for trade between Vietnam and China.

Khánh Linh
RELATED NEWS

Northwest at the end of the day: Northwest bus ticket prices on the eve of Tet

|

Ticket prices for Northwest passenger buses near Tet; About the place that provides "super cars" for Mr. Cong and Mr. Tao; Brilliant flowers in the border city after storms and floods are some of the prominent news.

Bus ticket prices in the Northwest near Lunar New Year

|

Passenger transport units in the Northwest region all ensure to keep fares unchanged to serve people and workers during the 2025 Lunar New Year.

Tao Quan ticket prices skyrocketed by 10 million VND before filming time

|

Before the recording of the Tao Quan program, the price of tickets increased to tens of millions of VND/pair.

Appointment of Deputy Chief of the Standing Office of the Party Central Committee Office

|

Ms. Nguyen Thi Thu Ha was transferred, assigned, and appointed to hold the position of Deputy Chief of the Standing Office of the Central Party Office.

Tet gift policy 2026 brings joy to people with meritorious services and the elderly

|

The policy of giving Tet Nguyen Dan Binh Ngo 2026 gifts of the Party and State contributes to bringing joy and warmth in the early spring days.

Mr. Hoang Trung Dung becomes Deputy Head of the Central Organization Committee

|

The Politburo transferred and appointed Mr. Hoang Trung Dung, Editor-in-Chief of the Communist Review Magazine, to hold the position of Deputy Head of the Central Organization Committee.

Quang Tri spends nearly 68 billion VND to give Tet gifts for Binh Ngo 2026

|

Quang Tri presents gifts from the Party and State on the occasion of the 2026 Binh Ngo Tet to people with meritorious services and vulnerable people in the province.

VNG requests postponement of working schedule with the Ministry of Industry and Trade on Zalo

|

VNG Company proposed to postpone the working schedule with the Ministry of Industry and Trade on updating the Zalo usage agreement because the information content needs to be summarized and prepared.

Northwest at the end of the day: Northwest bus ticket prices on the eve of Tet

Nhóm PV |

Ticket prices for Northwest passenger buses near Tet; About the place that provides "super cars" for Mr. Cong and Mr. Tao; Brilliant flowers in the border city after storms and floods are some of the prominent news.

Bus ticket prices in the Northwest near Lunar New Year

Yên San - Minh Nguyễn |

Passenger transport units in the Northwest region all ensure to keep fares unchanged to serve people and workers during the 2025 Lunar New Year.

Tao Quan ticket prices skyrocketed by 10 million VND before filming time

Nhóm PV |

Before the recording of the Tao Quan program, the price of tickets increased to tens of millions of VND/pair.