Reason why Binh Duong stopped piloting the penalty for overloaded vehicles on DT741

ĐÌNH TRỌNG |

Binh Duong province stops pilot plan to punish overloading by extracting data from vehicle load inspection station on DT741 road.

On October 2, the Binh Duong Provincial Electronic Information Portal reported that the Binh Duong Department of Transport has announced that it has not yet piloted the administrative penalty for individuals and organizations transporting goods by car through extracting data from the Vehicle Weight Inspection Station on Highway 741.

Previously, on September 16, 2024, the Department of Transport issued an official dispatch announcing a pilot program to sanction administrative violations against individuals and organizations transporting goods by car through extracting data from the Vehicle Weight Inspection Station at Km22+850 on DT 741 Road (Tan Binh Town, Bac Tan Uyen District, Binh Duong Province). The pilot program will start from October 1, 2024, with a pilot period of 12 months.

Dung ke hoach thuc hien thi diem xu phat qua tai tren DT 741. Anh: Dinh Trong
Stop the pilot plan to punish overloading on Highway 741. Photo: Dinh Trong

However, this must be stopped, the reason given is: According to Circular No. 28/2024/TT-BGTVT dated July 23, 2024 of the Ministry of Transport, effective from September 10, 2024, stipulates: "Fixed vehicle load inspection stations and mobile vehicle load inspection stations that have been invested in according to the provisions of QCVN 66:2013/BGTVT and put into operation before the effective date of this Circular shall continue to operate until the Road Law comes into effect".

Therefore, from October 1, 2024, the Department of Transport has not piloted administrative sanctions against individuals and organizations transporting goods by car through extracting data from the Vehicle Load Inspection Station on Highway 741 until detailed instructions are provided by competent authorities.

Duong DT 741. Anh: Dinh Trong
DT 741 Road. Photo: Dinh Trong

According to the Binh Duong Provincial Electronic Information Portal, while waiting for instructions, the Transport Inspectorate will coordinate with functional forces to set up checkpoints to handle cases of overloaded vehicles passing through the Vehicle Weight Inspection Station on Highway 741 recorded by the system.

Interprovincial roads are often damaged and lack lighting.

According to records, DT.741 is a vital traffic route connecting Binh Duong and Binh Phuoc. The road was invested and built under the BOT form, with toll stations. However, in recent years, many locations of the road have become bumpy and pothole-ridden, posing a danger to people participating in traffic.

In addition, people often complain about the lack of lighting, causing danger when participating in traffic at night. Many petitions have been sent to the authorities of Binh Duong province, but after many years, they have not been completely resolved.

ĐÌNH TRỌNG
RELATED NEWS

Man United leave Villa Park empty-handed

|

On the night of December 21 (Vietnam time), Man United lost 1-2 to Aston Villa in round 17 of the Premier League.

dong, people count down to welcome the moment Notre Dame Cathedral lights up

|

HCMC - From the afternoon, the center of HCMC was packed with people and tourists counting down, welcoming the moment Notre Dame Cathedral lit up, bringing a warm and bustling Christmas atmosphere.

Him Lam, Vinaconex are on the list of inspectors in 2026

|

Some investors and projects are included in the 2026 inspection plan of the Government Inspectorate.

Hanoi reclaims land, clears land to build Tran Hung Dao bridge

|

Hanoi - It is expected that there will be about 640 households subject to land acquisition and site clearance to build Tran Hung Dao bridge, with a total capital of VND 16,226 billion.

The Central Executive Committee of the Vietnam Young Physicians Association, course V, has 89 members

|

Ms. Bui Thi Minh Hoai - Politburo member, Secretary of the Party Central Committee, Chairwoman of the Central Committee of the Vietnam Fatherland Front attended the 5th National Congress of the Vietnam Young Physicians Association, term 2025 - 2030.

Ending the 886 billion VND flood control project after 16 years of unfinished

|

Ha Tinh - The Provincial People's Committee has just decided to terminate the project of the canal system for water separation, flood division, and flood prevention for communes in the south of Ky Anh after 16 years of unfinished work.

Securities waiting for cash flow's spread signal

|

The stock market returns to check the psychological resistance zone of 1,700 points according to the scenario of cash flow circulation between industry groups.

Many roads in Vinh City turned into rivers, rescue vehicles overloaded

QUANG ĐẠI |

Nghe An – After a prolonged downpour, many streets in Vinh city turned into rivers, submerged in a vast sea of ​​water.

Fines for motorbikes entering Thang Long Highway

Tô Thế |

Currently, authorities are diverting traffic for motorbikes onto Thang Long Avenue to avoid flooding within a certain area.

Thí điểm xử phạt xe quá tải ở trạm cân tự động trên ĐT741

ĐÌNH TRỌNG |

Tỉnh Bình Dương sẽ thí điểm xử phạt xe quá tải qua trạm cân tự động trên ĐT741.