MobiFone is ready to respond to storm No. 4

Linh Đan |

MobiFone Telecommunications Corporation announced that it is actively preparing both human and material resources, ready for storm prevention work No. 4.

Early morning of September 19, 2024, the tropical depression strengthened into a storm, with maximum winds of 74km/h (level 8), expected to make landfall in Quang Binh and Quang Tri this afternoon. The National Center for Hydro-Meteorological Forecasting said that at 4:00 a.m., the storm center was 210km from Da Nang and about 260km from Quang Tri, causing strong winds of level 6, gusting to level 7 on Con Co Island of Quang Tri.

To proactively respond to the impacts of storm No. 4, MobiFone is ready to deploy storm prevention and control plans, focusing on preventing heavy rains causing flash floods and localized flooding in some areas. In particular, focusing on reviewing stations, machine rooms, and shops in low-lying areas that are often deeply flooded during heavy rains to proactively lift and place equipment, goods, and handling plans in case of flooding.

At the same time, check fuel and the operating capacity of the backup generator to ensure readiness for emergency response in case of grid power failure. Strengthen monitoring of the optical transmission network, organize and implement emergency response by MobiFone and infrastructure leasing partners.

Tong cong ty thuong xuyen cap nhat huong di cua bao, cuong do va khu vuc co mua to de kip thoi trien khai phuong an phong chong hieu qua.

MobiFone Telecommunications Corporation regularly updates the direction of the storm, its intensity and areas with heavy rain to promptly deploy effective prevention plans. Photo: MobiFone

Previously, to respond to storm Yagi (storm No. 3), before the storm made landfall in the northern provinces, MobiFone had synchronously deployed many storm prevention and control measures such as checking and reinforcing vulnerable locations, checking station infrastructure, refueling generators, and organizing 24/7 network monitoring in provinces identified to be hit by the storm.

In particular, after the storm passed, the corporation promptly implemented many remedial measures, mobilizing technical teams to hot spots to promptly respond to information. Up to now, MobiFone has basically restored the entire network in the provinces and cities affected by storms and floods, ensuring smooth communication for the people.

With careful and serious preparation and experience from the recent storm No. 3, MobiFone has mobilized all resources to prepare response scenarios to minimize the impact of storm No. 4, ensure safety and maintain communication for people.

Linh Đan
RELATED NEWS

Secretary of the Hanoi Party Committee receives new duties

|

Hanoi established 2 steering committees to remove institutional and planning obstacles headed by Politburo member and City Party Secretary Nguyen Duy Ngoc.

Can Tho Oncology Hospital project increases capital by 344 billion VND, expected to be re-constructed by the end of the year

|

Can Tho - After adjustment, the 500-bed Oncology Hospital Project increased the investment to 344 billion VND compared to before; construction is expected to resume at the end of this year.

Lam Dong traffic police rescue 20 people trapped in Khanh Le Pass

|

Lam Dong - By 5:00 p.m. this afternoon, the Traffic Police had approached and rescued 20 people and 7 vehicles trapped in the middle of Khanh Le Pass.

Mr. Vo Trong Hai was elected to hold the position of Chairman of Nghe An Provincial People's Committee

|

Nghe An Mr. Vo Trong Hai, Deputy Secretary of the Provincial Party Committee, was elected to hold the position of Chairman of the People's Committee of Nghe An province.

Hue residents are tired of leaving as floods build up

|

HUE - 4 consecutive major floods, people in Hue have just moved out and the flood has recurred, everyone is tired and left.

Yang Mao commune in Dak Lak uses ropes to evacuate 200 people from flooded areas

|

Dak Lak - The authorities have used ropes to mobilize people in isolated flooded areas to safety.

No violations of Mailisa cosmetics have been detected, the Ministry of Health still warns of risks

|

Although there are no reports of violations with the cosmetics used by the Mailisa beauty salon, while waiting for the test results, the Drug Administration recommends that people be cautious when using the product.

Male doctor in Lam Dong died in a private house suspected of being injected with suicide

|

Lam Dong - The male doctor was found dead by his family in his private home, next to many bottles of medicine that were used suspected to be from suicide.

Dự báo thời gian tập trung mưa lớn do bão số 4 Soulik

AN AN |

Đại diện cơ quan khí tượng cảnh báo mưa cường suất lớn do hoàn lưu sau bão số 4 Soulik sẽ tập trung khu vực từ Hà Tĩnh - Quảng Trị trong chiều và đêm nay 19.9.

Hue evacuates people from dangerous areas to avoid storm number 4

PHÚC ĐẠT |

THUA THIEN HUE - To ensure people's safety before storm No. 4, authorities have evacuated hundreds of people in Nam Dong and Phu Loc districts to safety.

Win thousands of gifts in My MobiFone's point accumulation program

Linh Đan |

Gift after gift, the program "Accumulate points now - Receive gifts or 2024" continues to bring My MobiFone customers many valuable gifts.