MobiFone is ready to respond to storm No. 4

Linh Đan |

MobiFone Telecommunications Corporation announced that it is actively preparing both human and material resources, ready for storm prevention work No. 4.

Early morning of September 19, 2024, the tropical depression strengthened into a storm, with maximum winds of 74km/h (level 8), expected to make landfall in Quang Binh and Quang Tri this afternoon. The National Center for Hydro-Meteorological Forecasting said that at 4:00 a.m., the storm center was 210km from Da Nang and about 260km from Quang Tri, causing strong winds of level 6, gusting to level 7 on Con Co Island of Quang Tri.

To proactively respond to the impacts of storm No. 4, MobiFone is ready to deploy storm prevention and control plans, focusing on preventing heavy rains causing flash floods and localized flooding in some areas. In particular, focusing on reviewing stations, machine rooms, and shops in low-lying areas that are often deeply flooded during heavy rains to proactively lift and place equipment, goods, and handling plans in case of flooding.

At the same time, check fuel and the operating capacity of the backup generator to ensure readiness for emergency response in case of grid power failure. Strengthen monitoring of the optical transmission network, organize and implement emergency response by MobiFone and infrastructure leasing partners.

Tong cong ty thuong xuyen cap nhat huong di cua bao, cuong do va khu vuc co mua to de kip thoi trien khai phuong an phong chong hieu qua.

MobiFone Telecommunications Corporation regularly updates the direction of the storm, its intensity and areas with heavy rain to promptly deploy effective prevention plans. Photo: MobiFone

Previously, to respond to storm Yagi (storm No. 3), before the storm made landfall in the northern provinces, MobiFone had synchronously deployed many storm prevention and control measures such as checking and reinforcing vulnerable locations, checking station infrastructure, refueling generators, and organizing 24/7 network monitoring in provinces identified to be hit by the storm.

In particular, after the storm passed, the corporation promptly implemented many remedial measures, mobilizing technical teams to hot spots to promptly respond to information. Up to now, MobiFone has basically restored the entire network in the provinces and cities affected by storms and floods, ensuring smooth communication for the people.

With careful and serious preparation and experience from the recent storm No. 3, MobiFone has mobilized all resources to prepare response scenarios to minimize the impact of storm No. 4, ensure safety and maintain communication for people.

Linh Đan
RELATED NEWS

Factory fire near gas station in Ho Chi Minh City

|

Ho Chi Minh City - Ho Chi Minh City Police have controlled a factory fire near a gas station in Tan Hiep ward.

Ho Chi Minh City People's Committee headquarters nearly 120 years old will become a tourist attraction

|

Ho Chi Minh City - The headquarters of the People's Council - People's Committee of Ho Chi Minh City on Le Thanh Ton Street (nearly 120 years old) will be preserved and exploited as a tourist and educational destination.

Hanoi Party Secretary sets deadline for completion of "most expensive road on the planet

|

Hanoi - Regarding the progress of the Ring Road 1 project (Hoang Cau - Voi Phuc section), the Hanoi Party Secretary requested to complete the entire roadbed before September 2, 2026; complete the construction of 2 overpasses on the route before December 31, 2026.

Gia Lai drought, people dredge to find water sources to save crops

|

Gia Lai - The western region of the province is entering the dry season, many localities are facing severe water shortages.

Hanoi Traffic Police show trainees videos of accidents before driving test

|

Hanoi - Before the test, traffic police show trainees videos recording serious traffic accidents, thereby making them more aware of their responsibilities when holding the steering wheel.

Complete the installation of medical equipment at facility 2 of Bach Mai and Viet Duc Hospitals before June 30

|

Ninh Binh - The investor of Bach Mai Hospital and Viet Duc Friendship Hospital facility 2 project committed to complete the installation of equipment before June 30.

Salary reform from the Central to local levels, implemented in all 3 blocs

|

The Ministry of Home Affairs is assigned to carefully prepare the reform of salaries, allowances and other regimes from the Central to local levels, implemented in all 3 blocs.

Forecast of the risk of receiving strong storms and super typhoons in 2026

|

According to a representative of the meteorological agency, ENSO phase transition along with the impact of climate change leads to the risk of strong storms and super typhoons in 2026.

Dự báo thời gian tập trung mưa lớn do bão số 4 Soulik

AN AN |

Đại diện cơ quan khí tượng cảnh báo mưa cường suất lớn do hoàn lưu sau bão số 4 Soulik sẽ tập trung khu vực từ Hà Tĩnh - Quảng Trị trong chiều và đêm nay 19.9.

Hue evacuates people from dangerous areas to avoid storm number 4

PHÚC ĐẠT |

THUA THIEN HUE - To ensure people's safety before storm No. 4, authorities have evacuated hundreds of people in Nam Dong and Phu Loc districts to safety.

Win thousands of gifts in My MobiFone's point accumulation program

Linh Đan |

Gift after gift, the program "Accumulate points now - Receive gifts or 2024" continues to bring My MobiFone customers many valuable gifts.