Discovering a 1.6m long magnetic bomb that could easily explode if moving

HƯNG THƠ |

Quang Tri - The dangerous magnetic bomb was discovered near National Highway 15, and people had to be evacuated to handle it.

On March 18, the Engineering force - Quang Tri Provincial Military Command organized the handling and destruction of a magnetic bomb left over from the war.

Previously, during the organization of the mission in La Lay village (A Ngo commune, Dakrong district, Quang Tri province), the patrol team of the Commune Mobile Police Platoon discovered a bomb at Km10, National Highway 15D.

The Mobile Militia Platoon protected the scene and reported to the Quang Tri Provincial Military Command.

The Engineering force - Quang Tri Provincial Military Command arrived at the scene, mobilizing people living around to evacuate to a safe place.

Through inspection, it was determined that this was a dangerous magnetic bomb, coded MK36 500 bang Anh, containing 80kg of explosives, 160cm long, 27cm bomb diameter.

This type of bomb has a MK32 detonator, which cannot be moved safely, and must be detonated on the spot using remote electronic detonation.

The detonation process went smoothly, ensuring absolute safety for people and vehicles.

HƯNG THƠ
RELATED NEWS

Two bomb and mine clearing projects in Quang Tri resume operation

|

Quang Tri - Two bomb and mine clearing projects have resumed operations due to a temporary exemption decision by the US State Department.

Safety handling of a bomb discovered by people in Lam Dong

|

Lam Dong - The authorities have safely handled the bomb discovered by people in Da M'ri town, Da Huoai district.

Bomb longer than 1 meter discovered during road construction

|

Thanh Hoa - While constructing a road, workers discovered a bomb more than 1 meter long lying under the road.

Seafood restaurant fire in Bac Nha Trang ward

|

Khanh Hoa - Functional forces dispatched 2 fire trucks and 12 officers and soldiers to the scene to extinguish the fire at the seafood restaurant.

Gold price update at the closing session on June 16: Impressive recovery

|

Gold price update at the closing session on June 16: Domestic gold recorded the 3rd consecutive increase session, bringing the price level back to the 152 million VND/tael mark.

Bustling construction site of the Doi Canal North bank renovation project in Ho Chi Minh City

|

Ho Chi Minh City - The North bank of Doi canal project is being urgently constructed with many workers and machinery working to renovate and embellish the area.

Houses become digital addresses thanks to QR codes

|

Quang Tri - House number QR model is turning each household into a digital address, contributing to promoting digital transformation from residential areas to communities.

Ready to provide direct legal advice to thousands of workers and laborers

|

Many problems will be answered at the Legal Consulting Program organized by Lao Dong Newspaper, Vietnam Bar Federation and Ho Chi Minh City Labor Federation on June 21.

Two bomb and mine clearing projects in Quang Tri resume operation

HƯNG THƠ |

Quang Tri - Two bomb and mine clearing projects have resumed operations due to a temporary exemption decision by the US State Department.

Safety handling of a bomb discovered by people in Lam Dong

Lam Hồng |

Lam Dong - The authorities have safely handled the bomb discovered by people in Da M'ri town, Da Huoai district.

Bomb longer than 1 meter discovered during road construction

QUÁCH DU |

Thanh Hoa - While constructing a road, workers discovered a bomb more than 1 meter long lying under the road.