Society
Licensing for a large sand mine on the Ba River through Gia Lai
|
Gia Lai - Sand mine project owners must ensure the environment and regularly monitor riverbanks to respond to landslides threatening residential areas.
Checking alcohol concentration, Ho Chi Minh City fines nearly 900 cases in 1 day
|
In just one day, January 2, 2026, the Ho Chi Minh City Traffic Police force made records of handling 886 cases of alcohol concentration violations.
Lo River is killed by a series of illegal encroachment works
|
Tuyen Quang - A series of illegally encroached construction projects for a long time have gradually narrowed the Lo River bed, and the flow has been constricted.
Tourists flock to famous tourist areas and spots in Thanh Hoa during the holidays
|
Thanh Hoa - In the early days of the new year 2026, famous tourist areas and spots in Thanh land welcome a large number of tourists to visit and relax.
Forecast for the risk of storms, low pressure and cold rain in January
|
According to the meteorological agency, it is forecast that there is little chance of storms or tropical depressions appearing in the East Sea in January 2026.
Boating in flooded fields to provide hot rice to people in flooded areas
|
Quang Tri - Floodwaters have surrounded many villages in low-lying areas for the whole week, causing people to run out of clean water and food. Amid the surrounding hardship, the hot meals of love were moved to the flooded areas.
Accelerate waste-to-energy projects to end the situation of waste being left behind
|
Ninh Binh - With a large amount of waste remaining, causing environmental pollution, Ninh Binh province is directing to speed up the progress of waste treatment projects to end the above situation.
Fire at Winhouse apartment building in Ha Tinh
|
Ha Tinh - At about 5:30 a.m. on October 30, a fire broke out at an apartment on the 12A floor of Winhouse Ham Nghi apartment building, fortunately there were no casualties.
From November 1, a series of new regulations on certifying transactions on real estate and wills will be applied
|
According to the latest regulations, from the beginning of November, the scope of certification of the People's Committee at the commune level has been expanded.
Dai Ninh Pass in Lam Dong continues to collapse, traffic paralyzed
|
Lam Dong - Rocks and soil from the hill collapsed again, falling down Dai Ninh Pass (National Highway 28B), making it impossible for vehicles to travel.
Weather today, October 30: Cold air strengthens, causing rain
|
Weather today, October 30, due to cold air combined with high-altitude easterly wind disturbances, the Northeast region will have scattered rain.
Floodwaters have flooded, farmer's tractor has turned into a special rescue vehicle
|
Quang Tri - The whole commune was flooded with immense floodwaters, some families were flooded, some went to the hospital to need support, Mr. Phung was there. The tractor is often a means of livelihood, now becoming a special rescue vehicle when floods come.
Heartbroken to save a child floating in the floodwaters of the Han River, Da Nang
|
Da Nang - In the middle of a rainy and flooded night, Da Nang people saved a child drifting on the Han River.
In the midst of the flood in the Central region, whale drifted ashore in Da Nang
|
Da Nang - Ca Ong, 3m long, drifted ashore on Nguyen Tat Thanh beach in the middle of a historic flood.
Hanoi adjusts the time to ban vehicles from crossing Long Bien Bridge
|
Hanoi will temporarily ban all roads for rudimentary vehicles on Long Bien bridge from Bo De ward to Hoan Kiem ward for 61 days.
Swinging through the forest in the middle of the night, saving the lives of 3 victims of landslides
|
Da Nang - Dozens of officers stayed up all night to take the lives of 3 people buried by landslides.
Rescuing a boy swept away by floodwaters in Da Nang late at night
|
Da Nang - In the middle of the night, people joined forces to rescue a boy floating in the rushing floodwaters of the Han River, at the foot of the Dragon Bridge.
Hanoi requests to determine the cause of unfinished traffic projects that have lasted for many years
|
Hanoi requested the Department of Construction and the Project Management Board to review unfinished traffic projects that have been delayed for many years and have not been connected, determine the causes and propose solutions.
Hopefully, the site clearance milestone for the high-speed railway project will be handed over soon
|
The investor has not yet handed over the site clearance markers for the high-speed railway project, so the Ha Tinh functional sector is concerned about great pressure as time is getting faster.
Time to hand over enough land to open a 40m wide arterial road in Hanoi
|
Hanoi - It is expected that in the second quarter of 2026, the wards will hand over enough land to construct the expansion of Tam Trinh Street to 40m, with an investment capital of VND 3,354 billion.