Society

Ornamental plants in Nghe An are sluggish, garden owners lower prices waiting for customers

|

Nghe An - Ornamental plant markets on many central streets in the days leading up to Tet are still deserted, peach and kumquat trees are displayed all over the sidewalks, but purchasing power is weak, and sellers continuously lower prices.

Vehicles increase sharply on the 27th of Tet, traffic jams do not occur at the western gateway of Ho Chi Minh City

|

The number of people and vehicles leaving Ho Chi Minh City to the Mekong Delta provinces increased sharply on the 27th of Tet, but no traffic jams occurred.

New belief in particularly difficult villages in Dak Lak

|

Dak Lak - Entering a new phase, the Party Committee, government, and people in the province maintain their belief, develop the economy, and build a rich and beautiful homeland.

People in the border area of Lam Dong are assured to welcome Tet safely

|

Lam Dong - During the Lunar New Year, the Provincial Border Guard strengthens border protection, maintains security and order so that people in border areas can enjoy Spring and welcome Tet safely.

Dien Bien traffic police establish 5 points to support people returning to their hometowns during Tet

|

Dien Bien - The Traffic Police Department (CSGT), Provincial Police organizes support for people to return to their hometowns to celebrate Tet on key national highways.

Energy saving and efficiency become a national priority

|

On the morning of November 28, in Hue City, the Department of Innovation, Green Transformation and Industrial Promotion (Ministry of Industry and Trade) organized the "National Conference on Energy-saving and Efficient Use in 2025".

Expanding the search area for 2 missing fishermen at sea in Khanh Hoa

|

Khanh Hoa - A fishing boat setting anchor to avoid the storm sank, leaving 3 fishermen missing. To date, the authorities have found 1 person and expanded the search area at sea.

A person found dead in an apartment building in Ho Chi Minh City, suspected of falling from a terrace

|

HCMC - On November 29, the police are blocking off the scene and investigating the death of a woman suspected of falling from the rooftop of an apartment building on Phan Huy Ich Street.

Water levels of hydroelectric reservoirs in the North on November 29

|

Hydropower reservoirs in the North are flexibly operated according to flood developments, ensuring safety for downstream areas.

The most complicated intersection of Ho Chi Minh City Ring Road 3 speeds up, ready for technical traffic

|

Ho Chi Minh City - Tan Van intersection, the most complicated connection point on Ring Road 3, is accelerating construction, ready for technical traffic opening at the end of 2025.

Giap Bat Bus Station offers free admission for cars with less than 9 seats, motorbikes to pick up and drop off passengers

|

According to the leader of Giap Bat Bus Station, Hanoi, before the COVID-19 pandemic, the station used to serve an average of 15,000 visitors/day, with about 1,100 vehicles. However, after the pandemic, travel demand has decreased sharply, the station currently serves about 8,000 passengers/day, 700 vehicles/day, and hundreds of vehicles to increase transportation support during peak times.

Storm No. 15 Koto is about to change direction 3 more times, forecast affected areas

|

Storm No. 15 Koto will cause unfavorable weather in the area between the East Sea and the offshore waters from Gia Lai to Khanh Hoa.

pouring concrete to reinforce the slope on the Vinh Hao - Phan Thiet expressway to prevent flooding during the rainy season

|

Lam Dong - The construction unit is reinforcing the slope of the positive slope at km215 of the Vinh Hao - Phan Thiet expressway to completely handle flooding when there is heavy rain.

Finding a way to "revive" the 100-year-old banyan tree in Hue

|

HUE - An ancient banyan tree over 100 years old on Bach Dang Street was uprooted after floods. The Green Tree Park Center is studying a plan to save trees.

Accelerating the progress of the 500 billion VND road project that has not been completed after 13 years of construction in Lao Cai

|

Lao Cai - The National Highway 32C upgrade project, the section from Hien Luong - Yen Bai City (old) is being accelerated to open the route before December 31, 2025.

Strange tropical depression enters the East Sea with gusts of level 9, forecast path in the next 24 hours

|

The rare tropical depression entered the East Sea this morning, November 29, and is forecast to mainly affect the sea weather.

The largest hydroelectric reservoir in the south reduces flood discharge downstream to 770 m3/s to 1,120 m3/s

|

Dong Nai - Tri An Hydropower Reservoir reduces flood discharge to 770 m3/s to 1,120 m3/s.

The 39 km long road in Dong Nai connecting Long Thanh airport is about to start construction

|

Dong Nai - The project to upgrade and expand DT 773 route, over 39km long, passes through 8 communes connecting Ho Chi Minh City Ring Road 4 and Long Thanh airport.

Inside the 200 billion VND administrative headquarters in Lao Cai border area

|

Lao Cai - After two years of construction, the administrative headquarters of Bao Thang commune with an investment capital of 200 billion VND is gradually being completed.

The Civil Aviation Authority held an urgent meeting at night about 81 Vietnamese aircraft that may have to replace equipment

|

Informing Lao Dong Newspaper, Director of the Civil Aviation Authority of Vietnam Uong Viet Dung said that the Department has just held an urgent meeting on the implementation of replacement of aircraft equipment.