Society

Water level of some hydropower reservoirs in the Central - Central Highlands region on May 18

|

Hydropower reservoirs in the Central - Central Highlands region are generally still lower than the normal water level, many reservoirs continue to store water or generate electricity at a low level.

Many people ride motorbikes in the opposite direction after Cong Hoa road traffic diversion

|

Ho Chi Minh City - After applying the reversed lane on Cong Hoa street, the congestion situation has improved. However, the closing of barriers makes people confused when traveling.

Nearly 180 billion VND project in Quang Tri unfinished due to slow capital allocation

|

The Le Ky riverside residential area project, Quang Tri province is behind schedule even though it has been extended and is about to expire the construction time. The reason is that there are still more than 100m of ground, while people have agreed with the compensation plan, the investor has repeatedly requested to allocate funds but has not yet been funded.

Preventing the risk of fire and explosion from boarding houses and mini-apartments

|

Hanoi tightens fire prevention and fighting inspections at boarding houses and mini-apartments, forcing facility owners to upgrade safety to protect tenants.

Warning of heavy rain in 2 provinces, dangerous weather risk in the next 6 hours

|

The meteorological agency warned that Quang Ninh and Tuyen Quang provinces have recorded heavy to very heavy rain, preventing the risk of flash floods and landslides in the next 6 hours.

Vehicles turn around because the road is blocked, unable to connect to National Highway 49

|

HUE - Many vehicles turned around at the end of Huyen Tran Cong Chua street when the route was completed but was barricaded, not meeting the conditions to connect to National Highway 49.

My Phuoc - Tan Van road expanded from 6 to 12 lanes section passing Ring Road 3 HCMC

|

Ho Chi Minh City - After more than 2.5 years of construction, the Binh Chuan intersection of the Ho Chi Minh City Ring Road 3 project has gradually taken shape, a section of My Phuoc - Tan Van road has been expanded to 12 lanes.

Newborn baby girl abandoned on the road to a landfill in Hai Phong

|

Hai Phong - In the afternoon of February 24, Luu Kiem ward announced the search for relatives for the abandoned newborn baby girl.

Khanh Hoa reviews and rearranges the apparatus from province to grassroots level

|

Khanh Hoa - The locality will continue to review, arrange, and streamline the internal apparatus of departments, agencies, branches, and localities...

Safety notes when going to pagodas by boat

|

Many pagoda places at the beginning of the year have to travel by boat, posing a potential risk of unsafety if subjective. Below are some notes when traveling by boat on the river.

Responding to saltwater intrusion, Da Nang requests hydropower to prioritize water supply for people's livelihoods

|

Da Nang - To respond to drought and saltwater intrusion, the City People's Committee requests units to urgently stockpile water and request hydropower reservoirs to prioritize water sources for downstream areas.

Huu Nghi - Chi Lang expressway rushes in spring, 2,599 personnel race for progress

|

Lang Son - In the early days of the new year, when many places are still in the spring travel atmosphere, the large construction site of the Huu Nghi - Chi Lang expressway has resounded with the sound of machines.

Car crashes into motorbike on National Highway 4G, 1 person in Son La dies

|

Son La - A collision between a taxi and a motorbike at Km82, National Highway 4G, Chieng Khoong commune, killed 1 person on the spot.

Serious traffic accident in Hung Yen, 2 students died

|

Hung Yen - On February 24, on provincial road 456, passing through An Ninh village, Thai Thuy commune, a traffic accident occurred, killing 2 students on the spot.

Technology taxi driver carrying young children still violates alcohol concentration

|

National traffic police force discovered 2,111 cases of alcohol concentration violations on February 23. Notably, there were also technology taxi drivers carrying violating passengers.

Hanoi is determined to complete site clearance for National Highway 6 before June 30, 2026

|

Hanoi - Facing traffic pressure on National Highway 6, the government is focusing highly on site clearance, with the goal of completing the entire project before June 30.

Ho Chi Minh City accelerates green transformation roadmap

|

From March 1st, Ho Chi Minh City will have 25 more electric bus routes put into operation, marking a new step in the city's roadmap to transition to green transportation.

Hanoi exempts fares on 128 bus routes throughout the Tet holiday

|

Hanoi - Throughout the Tet holiday, Transerco's bus units have implemented toll exemption on 128 subsidized bus routes as directed by the city.

How to calculate pensions when retiring early in 2026

|

Calculating pensions when employees are eligible to retire before the prescribed age in 2026 has been guided by Vietnam Social Security (BHXH).

Initial cause of car plunging into canal killing 2 people in Gia Lai

|

Gia Lai - The initial cause of the 2 bodies and car under the Van Phong canal was determined to be due to the driver not being familiar with the road, causing an accident when entering a sharp bend.