Society
Series of disaster prevention and control projects in Hung Yen accelerate before the rainy and storm season
|
Hung Yen - Currently, a series of key disaster prevention and control projects in the area are being accelerated in construction progress to be completed before the rainy and storm season.
Phu Tho pilots "green channel" mechanism, quickly handling administrative procedures
|
Phu Tho pilots the "green channel" mechanism in resolving administrative procedures to serve the goal of double-digit economic growth, a working group has been established.
Clarify the fact that the Forest Management Board in Gia Lai concealed the case of protective forest exploitation
|
Gia Lai - Functional sectors are clarifying the fact that the Phu My Protection Forest Management Board (BQLRPH) concealed the case of the former Director of the former Phu My District BQLRPH arbitrarily exploiting forests.
A series of violations of illegal aquaculture are handled in Quang Ninh
|
Quang Ninh - A series of cases of illegal aquaculture have just been detected and handled at channels and water surfaces, tidal flats, in order to restore order.
The appearance of the parallel road of Ring Road 4 Hanoi
|
Hanoi - Ring Road 4 parallel road has basically completed the main works of bridges, culverts and other items, the output value reached about 85%.
Scene of a tractor-trailer catching fire fiercely on National Highway 12A
|
Quang Tri - At the scene, the cabin of the tractor-trailer was completely burned down after the fire broke out fiercely while the vehicle was traveling on National Highway 12A.
Prolonged consequences of overlapping Tam Dao National Park
|
The works located on land areas overlapping with the planning of Tam Dao National Park leave many long-term consequences for the ecosystem and natural environment.
Opening a landfill for waste for 10 communes and wards in the former Ha Long City and Cam Pha area
|
Quang Ninh - The province will put the landfill in Thong Nhat commune into operation in 2026 to treat waste for 10 communes and wards of Ha Long city and old Cam Pha.
Floating bridge nearly 3 decades awaiting "retirement", project worth more than 580 billion VND is about to start construction
|
Ninh Binh - After nearly 3 decades of serving people's travel needs, the Ninh Cuong pontoon bridge across the Ninh Co River is about to be replaced by a new, more solid bridge.
Landslides surround, Lao Cai traffic in danger before the rainy and flood season
|
Lao Cai - Thousands of landslide points have not been handled, many roads are seriously degraded, and traffic throughout the province is under great pressure as the rainy and flood season approaches.
Morning of the Mekong Delta 14. 04: Expected reopening date of Hau Giang - Ca Mau expressway
|
Morning of the Mekong Delta 14. 4: Expected reopening date of Hau Giang - Ca Mau expressway; 13-year-old child molester surrenders...
Alcohol and drug concentration test results of female driver causing chain collision in Hanoi
|
Hanoi - Functional forces have checked the alcohol and drug concentration of the female driver who caused a chain collision on the evening of April 13.
Officially completed drilling the Nhon - Hanoi Station metro tunnel
|
Hanoi - TBM "Daring" machine reaches Hanoi station, completes drilling 4km of tunnel, connecting the entire Nhon - Hanoi station metro line.
Trailer truck fire on National Highway 12A, cabin burned down
|
Quang Tri - The fire of a tractor-trailer on National Highway 12A caused the cabin to be burned down, functional forces promptly extinguished the fire, no casualties.
Weather today 14: 4: Continuing intense heat on a large scale
|
Weather today April 14, Thanh Hoa to Hue city has intense and especially intense heat; common temperature 38-40 degrees C, in some places above 40 degrees C.
Series of bridge and elevated road projects open a way out of traffic jams for the South of Ho Chi Minh City
|
Ho Chi Minh City will simultaneously implement many large-scale elevated bridge and road projects, hoping to open more traffic directions and reduce congestion in the South.
10-day weather forecast from April 14 to April 23 across the country
|
The National Center for Hydro-Meteorological Forecasting forecasts the weather for the next 10 days (from the night of April 13 to April 23) in regions across the country.
Causing a series of accidents in Hanoi, female driver collapses on the car steering wheel
|
Hanoi - A car driven by a female driver suddenly caused a chain collision on Doan Ke Thien street.
drowning victim found 8km from the scene
|
Thanh Hoa - Functional forces have found the body of a male student who drowned and went missing 3 days ago in Thieu Trung commune.
Ho Chi Minh City to submit policy to build Ho Tram expressway connecting Long Thanh airport
|
Ho Chi Minh City - The Ho Tram - Long Thanh airport expressway project, more than 42 km long, 8 - 10 lanes, with a total capital of 51,000 billion VND, will be submitted to the Ho Chi Minh City People's Council for approval on April 18.