On August 2, Vietnam Industrial Park Group, an industrial real estate developer in Vietnam, held a groundbreaking ceremony for Phase 2 of the ready-built warehouse project in DEEP C Industrial Park - Hai Phong (belonging to the Economic Zone). Dinh Vu - Cat Hai, Dong Hai 2 ward, Hai An district, Hai Phong).
Deep C Industrial Park project - Hai Phong has a total area of 23.2 hectares, of which, phase 1, the investor has implemented construction of more than 70,000 m2 of warehouse on an area of 10.6 hectares. Up to now, phase 1 has basically been filled by secondary investors, so Vietnam Industrial Park Group continues to deploy phase 2 construction on a total area of 12.6 hectares, with about more than 80,000 m2 of warehouse. Mixed workshop and high-quality warehouse, increasing the total rental floor area of the whole project to more than 150,000 m2 to serve businesses in the logistics field.
Deep C Industrial Park - Hai Phong phase 2 is a project that applies green building standards and aims to achieve LEED Silver (Silver) certification. Applying LEED standards and green building regulations helps customer businesses improve energy efficiency, save up to 25% of energy and reduce 10% of water use, optimizing operating costs…
Hai Phong is currently one of the top three localities in the country in attracting foreign investment (FDI) after the first 6 months of 2024, with a proportion of projects in the fields of high technology, processing, manufacturing, and logistics. reached more than 93%. Hai Phong's logistics service growth rate is about 20 - 23%/year, attracting many multinational logistics corporations to invest. In that context, the project "Deep C Industrial Park - Hai Phong" phase 2 is expected to be completed in January 2025, along with its strategic location in the national key coastal economic region and quality warehouse system. creating conditions for Hai Phong to increase the attraction of FDI capital in general and the logistics sector in particular.