Freshwater lake

Tra Vinh freshwater lake infrastructure construction reaches 20% after 4 months

|

Tra Vinh - After 4 months of construction, the Tra Vinh freshwater reservoir infrastructure project has reached over 20%, bringing hope to people in preventing saline intrusion.