Revealing the 1,000 billion VND route connecting Phuoc An port in Dong Nai
HÀ ANH CHIẾN |
Dong Nai - The route connecting to Phuoc An port (Nhon Trach district) is 6 km long, with a total investment of 1,000 billion VND and will be put into operation in 2025.