Duong River Bridge

Appearance of the 1,848 billion VND bridge in Hanoi after more than 1 year of construction

|

Hanoi - The Duong railway bridge project started construction in July 2023, with a total capital of VND 1,848.62 billion, and is expected to be completed in 2025.