technical information

Appearance of 4-lane elevated road in the East of Ho Chi Minh City

|

HCMC - The 14.7 km elevated road through Thu Duc City of Ring Road 3 has reached about 20% of construction progress and is expected to be technically open to traffic by the end of 2025.