Lang Danh Stream is an important drainage route for central wards such as Quan Trieu, Phan Dinh Phung and Quyet Thang.
In recent years, the situation of construction encroaching on the stream protection corridor has narrowed the flow. This affects drainage capacity, especially during the rainy and flood season.


In particular, a solid structure of Le Macaron International Kindergarten spanning the stream makes people angry.
Faced with the act of encroachment, functional agencies have requested this unit to dismantle the project and restore the original state to Lang Danh stream.
Recorded by Lao Dong Newspaper reporters on July 20, all violation items of Le Macaron Kindergarten have been dismantled.
The dismantling contributes to clearing the flow, ensuring drainage capacity for residential areas before the rainy and flood season.

Mr. Nguyen Van Hoai (Quan Trieu ward) said that in the past, the stream bed was tens of meters wide, and flooding rarely occurred.
Previously, the kindergarten construction blocked right on the stream, the flow was blocked, so water could not drain. This is the reason why the flooding situation has become serious.
Blocking the flow causes the stream water level in front and behind the project to clearly differ each rainy and flood season.
People are very excited when the stream encroachment project is dismantled. This will definitely help ensure safety during floods," Mr. Hoai said.
According to Ms. Nguyen Thi Minh Ly - Head of Residential Group 5, the dismantling of the violating construction has met the expectations of people in the area.
People hope that the protection of the stream corridor will be maintained regularly, so as not to let the encroachment situation reoccur.


On July 20, in an exchange with a reporter from Lao Dong Newspaper, Mr. Luu Anh Canh - Vice Chairman of Quan Trieu Ward People's Committee confirmed that the encroachment construction of the kindergarten has been dismantled.
On the entire stream corridor currently under the management of Quan Trieu ward, encroaching structures on the stream surface are no longer there.
Regarding some embankment works of people that have existed for a long time, the locality also needs the involvement of the managing unit of the stream. Provide documents related to the management scope of the stream corridor, the distance to determine the stream corridor calculated from which point to have a handling plan," the leader added.
