Quang Ninh will bid to build a second stop on the expressway

Nguyễn Hùng |

Quang Ninh - Quang Ninh plans to bid to select investors to build a stop on the Van Don - Mong Cai expressway.

This stop, according to the plan, is located in Quang Long commune, Hai Ha district, Quang Ninh province, with an area of 9.84 hectares.

Of which, 5.23 hectares of land have been cleared; the remaining 4.61 hectares have not been cleared.

According to the plan, on the expressway axis of about 176km long in Quang Ninh, including the expressways: Hai Phong - Ha Long, Ha Long - Van Don and Van Don - Mong Cai, there are 3 stops in Thong Nhat commune, Ha Long city, Dai Xuyen commune, Van Don district and Quang Long commune, Hai Ha district.

Thus, this will be the second stop on the more than 176km long expressway axis of Quang Ninh to be bid to select a construction investor.

Previously, a private investor in Hai Phong won a bid to build a stop at Km 20+062.80, on the Ha Long - Van Don expressway, in Thong Nhat commune, Ha Long city, Quang Ninh province.

The total area of this stop is 65,678.37m2, of which the construction area is 7,205.25m2, with a scale of 2 floors, with a total floor area of 10,000m2.

This is commercial service land, leased in the form of annual payment, for a term of 50 years, calculated from the date of the decision to recognize the auction results of the above land use rights. The winning bid price is more than 2.1 billion VND/year. The starting price is 1,109,241,991 VND/year. The starting price is stable for 10 years (according to the provisions of Clause 1, Article 3 of Decree No. 135/2016/ND-CP dated September 9, 2016 of the Government).

It is expected that the station will stop in Thong Nhat commune, Ha Long city, with a total construction investment of about 146 billion VND, and will be put into operation from October 2025.

Truc cao toc dai hon 176km cua Quang Ninh den nay van chua co tram dung chan nao. Anh: Nguyen Hung
The expressway axis of more than 176km long in Quang Ninh has not yet had any stopping stations. Photo: Nguyen Hung

When Quang Ninh inaugurated and put into use the third expressway - Van Don - Mong Cai expressway on September 1, 2022, making the province the locality with the longest expressway axis in the country, the demand for stopping stations for people and tourists increased, because on this 176km expressway axis, there is no one stopping station.

To serve tourists and people, in April 2023, due to the inability to build any stopping stations on the 176km long expressway axis, a unit sponsored to build a temporary public toilet in Mui Chua area, Tien Yen district.

This public toilet is located a few hundred meters from the Van Don - Mong Cai Expressway Toll Station, built with a 4 star assembled steel frame structure, convenient for drivers when traveling in both directions.

Nguyễn Hùng
TIN LIÊN QUAN

Auction of 20 district land plots in Hanoi highest at nearly 50 million VND/m2

|

On February 24, Phuc Tho district (Hanoi) successfully auctioned the right to use 20 plots of land.

12th Doctor is worried because of constantly changing enrollment information

|

Many 12th graders cannot help but panic when the admission information is continuously released before the 2025 high school graduation exam.

German Prime Minister Admits Failure, The Right wing Rises

|

German Chancellor Olaf Scholz officially admitted defeat in the election on February 23, paving the way for think tank think tank CDU/CSU to take power.

Doctor revives the lives of many children from liver transplantation

|

HCMC - With "the help of two golden hands", Dr. Tran Thanh Tri has successfully performed many liver transplants, saving the lives of many children.

Forecast of recreating the historic super typhoon

|

A historically strong super typhoon like Super Typhoon Beryl in 2024 could recur in the 2025 typhoon season, according to experts' warnings.

Using a frost-proof vehicle to improve the environment in 4 inner-city districts is reasonable

|

The proposal to use road users to spray fog and remove dust to improve the quality of environmental sanitation in 4 inner-city districts is receiving much attention.

Highland medicine for 14 years carries medicine to the village

|

"My Truc" is the affectionate name that locals call doctor Nguyen Van Truc after 14 years of silently bringing great changes to the health sector in the mountainous areas of Quang Nam.

Đầu tư 146 tỉ đồng xây trạm dừng chân đầu tiên trục cao tốc 176km ở Quảng Ninh

Nguyễn Hùng |

Quảng Ninh - Theo UBND TP.Hạ Long, doanh nghiệp tư nhân sẽ đầu tư khoảng 146 tỉ đồng để xây dựng trạm dừng chân tại Km 20+062.80, trên đường cao tốc Hạ Long - Vân Đồn, thuộc địa phận xã Thống Nhất, TP.Hạ Long, tỉnh Quảng Ninh.

Giá trúng thầu khu đất làm trạm dừng chân trên cao tốc Hạ Long - Vân Đồn

Nguyễn Hùng |

Quảng Ninh - UBND tỉnh Quảng Ninh đã có quyết định công nhận kết quả trúng đấu giá quyền sử dụng 65.678,37m2 tại xã Thống Nhất, TP Hạ Long để xây dựng trạm dừng chân đầu tiên trên trục cao tốc dài 176km của Quảng Ninh. Giá trúng thầu lô đất này cao gấp đôi giá khởi đầu.

Khẩn trương định giá đất để xây trạm dừng chân cao tốc Hạ Long - Vân Đồn

Nguyễn Hùng |

Quảng Ninh - UBND tỉnh yêu cầu các đơn vị liên quan khẩn trương xây dựng giá đất đối với trạm dừng chân đã được quy hoạch trên cao tốc Hạ Long – Vân Đồn để sớm khởi công xây dựng trạm dừng chân này. Hiện, trên trục cao tốc dài khoảng 176km của Quảng Ninh chưa có trạm dừng chân nào.