Traffic
Vietnam's highest vertical cable-stayed bridge accelerates to wait for assembly after nearly 11 years
|
Ho Chi Minh City - Phuoc Khanh bridge (belonging to Ben Luc - Long Thanh expressway) has reached about 96% of the volume, and is focusing all efforts on construction waiting for completion in May 2026.
Da Nang bans trucks on many streets, serving festivals
|
For 3 consecutive days - April 4 to 6, Da Nang banned trucks from circulating on many streets to serve the Quan The Am festival.
Accelerate construction of Ring Road 2.5 section passing through Cau Giay, Yen Hoa
|
Hanoi - Ring Road 2.5 project section passing through Cau Giay and Yen Hoa wards is being implemented urgently, mobilizing maximum manpower, machinery and continuous construction.
Hanoi Traffic Police comprehensively inspect vehicles serving flood prevention projects
|
Hanoi - Traffic police forces strengthen inspection of operating conditions of vehicles serving flood control projects, control alcohol and drug concentration with drivers.
Strong collision between car and motorbike causes 2 casualties in Lam Dong
|
Lam Dong - Collision between a tourist's car and a motorbike caused 1 death and 1 injury.