After the construction process, Sau Nho Bridge (Hamlet 5, Vinh Thuan Dong Commune, Long My District, Hau Giang Province) has been put into use. Attending the inauguration ceremony was Permanent Vice President of Hau Giang Provincial Labor Federation Le Thanh Phu.
The bridge is designed with a length of 20m, a width of 2.7m, and a clearance height of 2.5m. The total construction cost is 189 million VND.
After the bridge was put into use, it helped connect regional traffic , met the expectations of local people, and created safe conditions for students to go to school.
This is also an important event for Vinh Thuan Dong commune in the period of building new rural areas and advanced new rural areas in the period of 2021 - 2025, creating momentum for future development of the commune's people.