Phong Chau pontoon bridge
Phong Chau pontoon bridge resumes operation after storm No. 3 Wipha
|
Phu Tho - From 11:30 a.m. on July 23, Phong Chau pontoon bridge will be put back into operation, serving the people's travel.
Temporarily suspend Phong Chau pontoon bridge to prevent and combat storm No. 3 Wipha
|
Phu Tho - From 7:00 p.m. on July 21, Brigade 249 - Engineering Corps will cut Phong Chau pontoon bridge and ferry to prevent and combat storm No. 3 Wipha.
Phong Chau pontoon bridge cut again due to rising Red River water level
|
Phu Tho - Due to the high and fast-flowing Red River, to ensure safety, Phong Chau pontoon bridge will be temporarily closed until further notice.
Adjusting the operating hours of Phong Chau pontoon bridge
|
Phu Tho - According to the people's wishes, the authorities will adjust the operating hours of Phong Chau pontoon bridge during the day.
After 1 day of cutting Phong Chau pontoon bridge, flood water is still high
|
Phu Tho - After 1 day of authorities temporarily suspending the operation of Phong Chau pontoon bridge, the water level of the Red River is still high and flowing rapidly.