Pho Day River
The Pho Day River overpass, connecting National Highway 37, is about to be completed
|
Tuyen Quang - The Pho Day River overpass is 127 meters long, connecting with National Highway 37 (QL.17) at Km 188.
|
Tuyen Quang - The Pho Day River overpass is 127 meters long, connecting with National Highway 37 (QL.17) at Km 188.