Splicing
Ba Lai 8 bridge joins, opening the connecting axis to the East of Vinh Long province
|
Vinh Long - Ba Lai 8 bridge joins the main span after 22 months of construction, opening up more momentum to connect and develop the Eastern sea economy of the province.
