Just go through the ward in Bac Ninh and pay the fee like going to Hanoi

Xuyên Đông |

Voters in Bac Ninh expressed that even if they only go through the ward (5 km), they still have to pay the highway fee to Hanoi.

Voters in Bac Ninh province sent a petition to the Ministry of Transport, reflecting that the toll station on the Hanoi - Bac Giang Expressway is located in two wards, Dinh Bang and Phu Chan, Tu Son city. People in the two wards are within a 5 km radius but still have to pay the toll, which is inappropriate. It is requested to review and amend the above regulation.

Responding to this issue, the Ministry of Transport said that for the Hanoi - Bac Giang expressway, the Ministry of Transport will coordinate with the People's Committees of Bac Ninh, Bac Giang provinces, Hanoi city and relevant agencies to soon study the investment plan to upgrade to a complete expressway scale in the period of 2026 - 2030, including investing in the completion of the system of service roads and parallel roads on both sides of the expressway (no toll collection) to serve the production, living and travel needs of people in the area.

The Ministry of Transport added: According to the Road Network Planning for the 2021 - 2030 period approved by the Prime Minister in Decision No. 1454/QD-TTg dated September 1, 2021, the Hanoi - Bac Giang expressway section belongs to the North - South expressway in the East, with a length of 46 km (the route coincides with National Highway 1), a scale of 8 expressway lanes, and an investment schedule before 2030.

To meet the transportation demand and create momentum for socio-economic development, in the context of the state budget's difficulties, in 2013, the Prime Minister approved the investment policy to upgrade National Highway 1, Hanoi - Bac Giang section under the BOT contract form, using the toll station at Km152+00 (in the area of ​​02 wards Dinh Bang and Phu Chan, Tu Son city) to collect capital recovery fees. The project was completed, put into operation and started collecting fees from 2016, the estimated capital recovery fee collection period is 18 years and 7 months.

Currently, the traffic network connecting Bac Ninh city with Hanoi city, in addition to National Highway 1 (Hanoi - Bac Giang Expressway), also includes routes such as Provincial Road 277 (Phu Dong dike road), old National Highway 1 (Road 295B) and other internal routes. Therefore, people in Phu Chan and Dinh Bang wards can choose the above routes in combination with Dai Dinh overpass, residential tunnels to travel to Hanoi city and vice versa without paying fees. In addition, the traffic volume on the Hanoi - Bac Giang Expressway is increasing rapidly, posing a very high risk of traffic jams and accidents.

Implementing Resolution No. 140/2024/QH15 of the National Assembly and the direction of the Prime Minister in Official Dispatch No. 16/CD-TTg dated February 21, 2024, the Ministry of Transport is urgently developing a plan to upgrade expressways to full scale.

Xuyên Đông
TIN LIÊN QUAN

Bac Ninh Secretary talks about the province's orientation in 2025

|

In 2025, Bac Ninh will focus on building a project to upgrade Bac Ninh to become a class 1 urban area and a centrally-run city.

Live football Man United 0-1 Bournemouth: First half

|

Live match between Man United vs Bournemouth takes place at 9:00 p.m. on December 22.

Ministry of Health informs about milk contaminated with detergent in Korea

|

The Food Safety Department - Ministry of Health has just informed about the incident of recalling sterilized milk products contaminated with detergent in Korea.

EU faces a disaster, at risk of losing both Russian gas and new sources

|

Qatar, the world's largest LNG exporter, has threatened to cut off gas supplies to the EU if it is fined under new EU laws.

Plan to streamline and take over new areas of the Ministry of Health

|

The Ministry of Health has developed and submitted to the Government Steering Committee a project to reorganize and streamline the Ministry of Health's apparatus on the basis of taking on a number of new tasks.

A girl in Tuyen Quang was hit and killed by a car while playing in her house

|

While playing indoors with her mother, a 17-month-old girl in Tuyen Quang City was suddenly hit and killed by a car that crashed into her house.

Reappointment of two Deputy Directors of Provincial Police

|

Binh Phuoc and Quang Ninh Provincial Police recorded the reappointment of the Deputy Director position with two colonels and many other personnel being transferred.

People queue for kilometers to take Metro after more than 10 years of waiting

|

HCMC - A large number of people from districts of HCMC flocked to Metro Station No. 1 to experience the subway after more than a decade of waiting.

Làng bún nổi tiếng ở Bắc Ninh khiến dòng kênh ô nhiễm nặng

Vân Trường |

Bắc Ninh - Làng bún Khắc Niệm thải ra khoảng 4.500 - 5.000 m3 nước thải mỗi ngày đêm, khiến kênh Tào Khê ô nhiễm nặng.

Sở Tài nguyên và Môi trường Bắc Ninh xếp cuối về chuyển đổi số

Trần Tuấn |

Sở Tài nguyên và Môi trường Bắc Ninh xếp hạng 17/17 về xếp hạng chỉ số chuyển đổi số cấp sở tại Bắc Ninh.

Bac Ninh Secretary talks about the province's orientation in 2025

Vân Trường |

In 2025, Bac Ninh will focus on building a project to upgrade Bac Ninh to become a class 1 urban area and a centrally-run city.