Deadline for completing the project to renovate 4 old apartment buildings in Dong Da

KHÁNH AN |

Hanoi - The city requires Dong Da district to complete the detailed planning project for the renovation and reconstruction of 4 old apartment buildings in March 2025.

On March 20, the Office of the City People's Committee issued a notice of the conclusion of Vice Chairman of the City People's Committee Duong Duc Tuan at the working session on 4 detailed planning projects for the renovation and reconstruction of the old apartment complex Kim Lien, Trung Tu, Khuong Thuong, Hao Nam, Dong Da district.

Accordingly, Vice Chairman of the People's Committee of Duong Duc Tuan directed the People's Committee of Dong Da District to closely coordinate with the city's departments and branches, implementing in parallel, and at the same time, procedures for collecting public opinions, reporting to the City's Construction Planning and Urban Planning Appraisal Council and relevant agencies, completing 4 detailed planning projects in March 2025, submitting them to the Department of Planning and Architecture for project appraisal in April 2025, and submitting them to the City People's Committee for consideration and approval in May 2025.

The old apartment complexes of Kim Lien, Trung Tu, Khuong Thuong are concentrated at the connection point of traffic routes and urban railways; creating an important urban space of the city. Therefore, Dong Da District People's Committee presides over and directs consulting units to study the planning structure of the area, including the three old apartment buildings mentioned above, associated with planning blocks according to the H1-3 urban subdivision planning, to calculate and fully balance the social infrastructure system and general technical infrastructure for the whole area; study urban models and spaces to ensure unity, synchronization, connectivity, and mutual support. In particular, it is necessary to study the structure of the Chua Boc - Pham Ngoc Thach - Ton That Tung intersection, connecting all 3 old apartment buildings mentioned above.

For the area around urban railway station No. 2, study the formation of a construction complex according to the TOD model, applying the provisions of the Capital Law, Resolution No. 188/2025/QH15 dated February 19, 2025 of the National Assembly.

For the old Kim Lien apartment building, the City People's Committee agreed to study the orientation of building a spatial axis parallel to Pham Ngoc Thach Street, rearranging functional areas; keeping the axis of social infrastructure works in their current state; keeping part of low-rise housing areas, integrating with the space for renovation and reconstruction of the old apartment building.

For the old Trung Tu Apartment Complex, the detailed planning plan for the old Trung Tu Apartment Complex is basically agreed according to the proposal of the People's Committee of Dong Da District.

For the old Khuong Thuong apartment complex, the proposal to resettle low-rise housing projects on Ton That Tung Street, south of Hanoi Metallurgy Joint Stock Company was agreed.

For the old Hao Nam apartment complex, the City People's Committee basically approved the detailed planning plan according to the proposal and recommendation of the Dong Da District People's Committee. To complete the detailed planning project, Dong Da District People's Committee is requested to direct and coordinate with the consulting unit to expand the scope of the planning area's restructuring research to Hao Nam street, including Cat Linh railway station (Cat Linh - Ha Dong urban railway line), to synchronously connect works, technical infrastructure systems, identify valuable architectural works, effectively exploit cultural - historical values, and commercial services in the area.

KHÁNH AN
RELATED NEWS

Hanoi speeds up renovation and construction of a series of old apartment buildings

|

Hanoi - In the first months of 2025, the Hanoi People's Committee continuously approved plans to renovate and rebuild old apartment buildings in the capital.

Research on building a 40-storey apartment building in an old apartment complex in Ba Dinh

|

Hanoi - The city requires Ba Dinh district to study the construction of a maximum apartment building of 40 floors in the old Thanh Cong apartment complex.

New information on the renovation of 3 old apartment buildings in Dong Da district

|

Hanoi - Regarding the plan to renovate old collective housing areas, Dong Da district has assigned relevant units to develop a planning project.

High tides inundate about 500 houses in Ly Son Special Zone

|

High tides rose more than 4m in Ly Son on the evening of November 6, causing 500 houses to be flooded, and the authorities urgently responded.

Lao Dong Newspaper won the National Press Award for the development of Vietnamese culture

|

On the evening of November 6, at Ho Guom Theater (Hanoi), the 3rd National Press Award Ceremony "For the Development of Vietnamese Culture" took place. Lao Dong Newspaper won 1 Encouragement Prize.

Storm No. 13 gusts to level 12 but is not a typhoon

|

On the evening of November 6, storm No. 13 officially made landfall in the coastal area from Quang Ngai to Dak Lak very strongly, but it did not have to be a typhoon.

Quang Ngai authorities strive to protect people in the midst of storm No. 13

|

Quang Ngai - Storm No. 13 has made landfall in Quang Ngai with strong gusts of wind. Sa Huynh coastal ward has urgently evacuated more than 600 households.

Fierce tornado in Quang Ngai causes dozens of houses to lose roofs

|

Quang Ngai - A powerful tornado swept through Long Phung commune on the afternoon of November 6, sweeping away the corrugated iron roofs, damaging dozens of houses.

Hanoi speeds up renovation and construction of a series of old apartment buildings

KHÁNH AN |

Hanoi - In the first months of 2025, the Hanoi People's Committee continuously approved plans to renovate and rebuild old apartment buildings in the capital.

Research on building a 40-storey apartment building in an old apartment complex in Ba Dinh

KHÁNH AN |

Hanoi - The city requires Ba Dinh district to study the construction of a maximum apartment building of 40 floors in the old Thanh Cong apartment complex.

New information on the renovation of 3 old apartment buildings in Dong Da district

Linh Trang - Cao Thơm |

Hanoi - Regarding the plan to renovate old collective housing areas, Dong Da district has assigned relevant units to develop a planning project.