The Office of the Hanoi People's Committee has just issued a notice on the conclusion of Vice Chairman of the Hanoi People's Committee Duong Duc Tuan at the meeting to review the detailed planning plan for the area for renovation, reconstruction, and reconstruction of the three old apartment buildings of Thanh Cong, Giang Vo, Ngoc Khanh in Ba Dinh district and surrounding areas.
For the old Thanh Cong and surrounding collective housing areas, the City People's Committee basically agreed with the architectural planning research plan proposed by the People's Committee of Ba Dinh District and the consulting unit. The proposed plan is relatively orderly and strict, but there has been no innovation or breakthrough. Therefore, based on the proposed plan, it is necessary to add some deeper studies to perfect the plan.
Accordingly, it is necessary to study some roads connecting Thanh Cong Lake space and flower garden and green space in the reconstruction area; study and expand some internal roads that are large enough, study and supplement, develop green space, and can combine underground space; some areas of renovated technical infrastructure are combined and integrated into green space and landscape.
Research and develop higher floors for "useful" space for apartment and resettlement (maximum 40 floors), apply highlight works for TOD areas (according to the provisions of the Capital Law); harmoniously calculate the area of surplus commercial apartments, creating a larger land fund for commercial and service "products".
For the area of arranging commercial and service space, it is necessary to study more special forms into combinations with innovative spaces; create unique commercial bottles, create more flexible functions and diverse forms at the bottle.
The Hanoi People's Committee assigned the Ba Dinh District People's Committee to urgently coordinate with the consulting unit to complete the plan, send it to the Department of Planning and Architecture for appraisal according to the process and regulations, and submit it to the City People's Committee for approval before March 25.
For the old Giang Vo and surrounding collective housing areas, the City People's Committee proposed that the People's Committee of Ba Dinh District develop a new, visionary landscape architectural space and infrastructure; maximize green space and underground space; It is necessary to study a number of breakthrough high-rise buildings in the area near Giang Vo and Kim Ma streets to create a complex of construction foundations with commercial and service functions, increase the area of trade and services...
Study the synchronous architectural space, landscape and infrastructure plan for the western area of Giang Vo Lake, close the planning area, in accordance with the detailed planning at the land plot at 148 Giang Vo Street and in accordance with the overall detailed planning of the old Giang Vo apartment complex and surrounding areas.
The People's Committee of Ba Dinh District urgently coordinates with the consulting unit to complete the plan, send it to the Department of Planning and Architecture for appraisal according to the process and regulations, and submit it to the City People's Committee for approval before March 31.
For the old Ngoc Khanh and surrounding collective housing areas, it is recommended that the People's Committee of Ba Dinh District and the consulting unit re-study the functional space and infrastructure plan, have stronger solutions, do not leave the space alone; Kim Ma areas, TOD areas of S9 station must have specific solutions; research and create a traffic axis combined with landscape space; connect Ngoc Khanh Lake - Giang Vo Lake, the axis connecting Kim Ma Street and Nguyen Cong Hoan Street; in case of necessity, it is necessary to accept the demolition of some unsuitable works.
At the same time, check, re-esternize, and handle the whole process; create an innovation model, and consider the option of choosing 1 neighborhood to study on-site relocation, subdivision of space, and arrangement of resettlement on-site ( Limited scope). Research and impact on the area of land allocation for commercial and service along Nguyen Chi Thanh Street, determine appropriate architectural planning solutions, study plans to link works, not to let them be dispersed or dispersed.
The People's Committee of Ba Dinh District urgently guides and coordinates with the consulting unit to complete the plan, organize to collect community opinions according to regulations; submit to the Department of Planning and Architecture for re-evaluation; submit to the City People's Committee for approval in May 2025.