The two projects inaugurated are the Project to repair the inter-village road Ha Nhuan 1, Ha Nhuan 2 (now Ha Nhuan 1, Ha Nhuan 2 residential group) and the Project to repair the City Youth Union road in Ha Nhuan 2 residential group.
The project to repair the inter-village road Ha Nhuan 1, Ha Nhuan 2 has a length of 1,737.43 m, a road surface width of 5.5 m, and sidewalk paving grooves on both sides, with a total investment of more than 14.7 billion VND. The project to repair the Thanh Doan road has a length of 948.35 m, the road surface structure uses asphalt concrete layer, and at the same time completes the traffic safety system such as road marking paint, safety sign system, and lighting system, with a total investment of 7.368 billion VND.
Speaking at the ceremony, leaders of An Phong Ward People's Committee emphasized that the investment in renovating and upgrading roads is proof of the concern of all levels of government for people's lives, and is also one of the pilot projects to celebrate the election of National Assembly deputies of the 16th term and People's Council deputies at all levels for the 2026-2031 term.
The completed and put into use projects contribute to embellishing and modernizing the ward's urban area, ensuring the travel and living needs of the people. Thereby contributing to ensuring traffic order and safety, reducing accidents and traffic congestion, and ensuring environmental sanitation in a civilized and urban aesthetic direction.