24h Life: Ha Tinh to Quang Tri Expressway must be completed before April 30

Vinh Phú |

24h Life: The expressway from Ha Tinh to Quang Tri must be completed before 30.4; Tan Son Nhat airport denies rumors about the time of operation of the T3 terminal; Smoke and fog due to grass fire, no access to the Phan Thiet - Dau Giay expressway can be seen.

The expressway from Ha Tinh to Quang Tri must be completed before April 30

On the morning of March 10, in Dong Ha City (Quang Tri), Deputy Prime Minister Nguyen Chi Dung led a working delegation with leaders of the three provinces of Quang Binh, Quang Tri, and Ha Tinh on the difficulties and obstacles in implementing 5 important expressway projects including: Bai Vot - Ham Nghi, Ham Nghi - Vung Ang, Vung Ang - Bung, Bung - Van Ninh, Van Ninh - Cam Lo.

Concluding the meeting, the Deputy Prime Minister requested localities not to be subjective, negligent, or cling to the site, and to be determined to achieve the target of completing the 5 expressway projects mentioned above by April 30 so that the route can be opened to traffic by June 30.

See details here!

Tan Son Nhat Airport denies rumors about the time of operation of terminal T3

On March 10, Tan Son Nhat International Airport denied rumors of spreading the T3 terminal exploited since May 5, 2025, affirming that this is not official information.

In recent days, social networks have spread information that from May 5, terminal T3 will take over procedures for domestic flights of Vietnam Airlines and Vietjet Air, while the old terminal T1 (domestic terminal) will complete procedures for domestic flights operated by Bamboo Airways, Pacific Airlines, Vietravel Airlines and Vasco.

However, the representative of Tan Son Nhat International Airport affirmed that this is not information provided by the Port, passengers need to be careful when reading this information. Currently, the units have not yet officially announced the exploitation plan at terminal T3 as well as the existing terminal after terminal T3 is put into use.

See details here!

Smoke is everywhere due to grass fire, no road to Phan Thiet - Dau Giay Expressway can be seen

At about 2:00 p.m. on March 10, at the entrance to Phan Thiet - Dau Giay Expressway at Ba Bau intersection in Ham Kiem Commune, Ham Thuan Nam District, Binh Thuan Province, a dry grass fire broke out.

At the scene, the fire was engulfed in flames combined with strong winds, causing the fire to splash onto the road leading to the highway where a car was traveling. Smoke rose foggyly, causing cars traveling through the burning location to have limited visibility, making it impossible to see the vehicles in front.

See details here!

Vinh Phú
TIN LIÊN QUAN

24h Life: Rural land prices exceed 50 million VND/m2

|

24h Life: Inauguration of Metro Line 1 after serving 5 million visitors; Rural land prices exceed 50 million VND/m2...

24h Life: Ho Chi Minh City residents buy gold as gifts 8.3

|

24h Life: Gold price is at a high level, Ho Chi Minh City residents still buy as gifts 8.3; Wild flowers on the grass field in the highlands on March 8...

24h Life: Quitting work at a company with more than 11,000 employees in Nam Dinh

|

24h Life: Stop working at a company with more than 11,000 employees in Nam Dinh; Search for victims of a fraud that appropriated nearly 30 billion VND; Comprehensive inspection of mineral collection activities in Lam Dong.

24h Life Rhythm: Turn on the expansion slot on the highway, causing many vehicles to be in distress

|

24h Life: Opening train ticket sales of April 30 - 1.5, passengers should order early; Revealing expansion joints on the highway causing many vehicles to be in distress; 4 trillion-dong projects connecting Ho Chi Minh City with Long Thanh airport.

24h Life: Rural land prices exceed 50 million VND/m2

Thanh Thanh (T/H) |

24h Life: Inauguration of Metro Line 1 after serving 5 million visitors; Rural land prices exceed 50 million VND/m2...

24h Life: Ho Chi Minh City residents buy gold as gifts 8.3

HẠ MÂY (T/H) |

24h Life: Gold price is at a high level, Ho Chi Minh City residents still buy as gifts 8.3; Wild flowers on the grass field in the highlands on March 8...

24h Life: Quitting work at a company with more than 11,000 employees in Nam Dinh

Vinh Phú |

24h Life: Stop working at a company with more than 11,000 employees in Nam Dinh; Search for victims of a fraud that appropriated nearly 30 billion VND; Comprehensive inspection of mineral collection activities in Lam Dong.

24h Life Rhythm: Turn on the expansion slot on the highway, causing many vehicles to be in distress

Vinh Phú |

24h Life: Opening train ticket sales of April 30 - 1.5, passengers should order early; Revealing expansion joints on the highway causing many vehicles to be in distress; 4 trillion-dong projects connecting Ho Chi Minh City with Long Thanh airport.