Hanoi adjusts urban planning in Dong Anh

KHÁNH AN |

Hanoi locally adjusted the urban subdivision planning N7, scale 1/5000 in Tien Duong commune, Dong Anh district.

Vice Chairman of Hanoi People's Committee Duong Duc Tuan has just signed a decision to locally adjust the urban subdivision planning N7, scale 1/5000 at planning block VII.2.3 in Tien Duong commune, Dong Anh district.

Accordingly, the locally adjusted land has the Southwest bordering National Highway 23B, the East bordering green land and planned ditches, the Northeast bordering the planned road with a cross-section of 30m, and the Northwest bordering the planned road with a cross-section of 20.5m.

Total research land area is about 9.63ha.

The adjustment objective is to arrange land to build working headquarters for the Dong Anh District Military Command, Dong Anh District Police attached to the working headquarters of district-level agencies (Department of Judgment Execution, Dong Anh District People's Court, Dong Anh District Procuracy and functional agencies of Dong Anh District People's Committee) to form an inter-agency area with synchronous, spacious infrastructure, independent from surrounding residential areas.

Building facilities to ensure working conditions, training and combat readiness for officers and soldiers of the Military Command and Police of Dong Anh district.

At the same time, it is the place to hold local conferences on security, national defense, local military and other activities; it is the unified command center, commanding and operating the activities of the local people's armed forces in peacetime and ready to handle situations occurring in the area; planning regular, synchronous barracks, with reasonable functional subdivisions, convenient for performing tasks, well meeting the requirements of tasks in the new situation.

Serve as a legal basis for establishing construction investment projects according to approved planning and as a basis for local government management agencies to carry out construction investment management according to the provisions of law.

According to the urban zoning plan N7, scale 1/5000 approved by the City People's Committee on May 25, 2012, the locally adjusted land (area of ​​about 9.63ha) belongs to the planning block coded VII.2.3, with a road section B=20.5m divided into 2 parts.

The land to the Northeast of route B=20.5m (area of ​​about 3.22ha) has the function of residential green land with the following criteria: maximum construction density of 5%, maximum height of 1 floor.

The land to the southwest of the road with cross-section B=20.5m includes functions of land for agencies, research institutes, and training schools (with a maximum construction density of 70% and a maximum height of 7 floors; land for newly built residential groups has a maximum construction density of 70% and a maximum height of 7 floors).

Now locally adjusting the N7 subdivision planning at the 9.63ha land plot in planning block VII.2.3, keeping the road section B=20.5m as planned (area about 0.56ha).

The land to the northeast of the road with cross-section B=20.5m (area of ​​about 3.22ha) adjusts a part of land with an area of ​​about 2.05ha (located in the northwest) from the function of green land for new residential units to national defense land (arrange to build the headquarters of the Dong Anh District Military Command); the remaining land area of ​​about 1.17ha retains the function of green land for residential units.

The land to the southwest of the road with cross-section B=20.5m (area of ​​about 5.85ha), retains the functional land of agencies, research institutes, and training schools according to the planning.

Adjusting functional land from newly built housing group land to security land; residential unit green land; land for agencies, research institutes, training schools, etc.

The City People's Committee assigned the Dong Anh District People's Committee to preside over and coordinate with the Department of Planning and Architecture to organize the public announcement of the above-mentioned partial adjustment project of the N7 urban subdivision planning so that relevant organizations, agencies and people can know.

Relevant city departments and branches perform state management according to assigned functions and tasks.

KHÁNH AN
TIN LIÊN QUAN

Tu Lien Bridge is the desire of the people and government of Dong Anh

|

Hanoi - According to the People's Committee of Dong Anh district, the construction of Tu Lien bridge and the roads at both ends of the bridge is the desire of the people and local authorities.

Efforts to relocate more than 46,000 houses: The problem of urban beautification in Ho Chi Minh City

|

With many solutions from increasing support to concentrating efforts on site clearance, Ho Chi Minh City aims to relocate 46,500 houses along rivers, canals and ditches from now until 2030 to renovate the urban area and exploit land funds for development.

Hanoi is in the top 3 most polluted areas in the world. Which area has the most fine dust this morning?

|

Air Visual air quality index application ranked Hanoi as the third most polluted in the world this morning (December 25).

Westerners: Christmas in Vietnam is more magnificent than imagined

|

Hanoi - Foreign visitors are excited to experience Christmas in Vietnam for the first time.

The West Launches a War on Russian Assets

|

$1 billion from Russian assets seized by the West has been transferred to Ukraine.

Gold fever will not stop in 2025

|

In 2024, gold prices made history with memorable milestones. According to experts, the gold "fever" shows no signs of cooling down.

The most beautiful street in Long Bien is in disarray after 2 months of opening to traffic

|

Hanoi - Currently, the extended Hong Tien route (Long Bien district) - with a total investment of over 1,200 billion VND, is seeing many garbage and scrap dumping sites.

Terrifying scene of "crazy drivers" speeding through checkpoint 141H

|

Hanoi - Many "speed demons" took advantage of Christmas Eve to go out on the streets and drive their motorbikes at high speed, bypassing the checkpoint of the 141H task force.

Tu Lien Bridge is the desire of the people and government of Dong Anh

NHÓM PV |

Hanoi - According to the People's Committee of Dong Anh district, the construction of Tu Lien bridge and the roads at both ends of the bridge is the desire of the people and local authorities.

Chuẩn bị đấu giá hơn 3.000m2 đất tại Đông Anh, Hà Nội

KHÁNH AN |

Hà Nội - Trong tổng hơn 18.000m2 đất mà TP Hà Nội vừa giao cho huyện Đông Anh, có hơn 3.000m2 đất để lập phương án đấu giá quyền sử dụng đất.

Tuyến đường mới rộng 6 làn xe ở huyện Đông Anh, Hà Nội

KHÁNH AN |

Hà Nội - Tuyến đường từ đường gom Quốc lộ 3 mới qua UBND xã Vân Hà đến hết địa phận huyện Đông Anh rộng 6 làn xe, chiều dài khoảng 1,84 km.