When Chairman Nguyen Van Duoc suggested that the government not let people have to apply for a construction permit

Lê Thanh Phong |

Chairman of the Ho Chi Minh City People's Committee Nguyen Van Duoc suggested that in areas with detailed planning, people only need to register, not have to apply for a construction permit.

The above proposal was made at the Conference to announce the Project to adjust the general planning of Ho Chi Minh City to 2040, with a vision to 2060 held on June 25.

Chairman Nguyen Van Duoc requested departments, branches, especially the Department of Construction and ward and commune authorities in the 2-level government system that is about to operate, to quickly implement zoning plans and detailed plans as a legal basis for management and investment attraction.

Based on the detailed planning, Mr. Nguyen Van Duoc suggested that authorities at all levels not let people apply for construction permits, but only register for construction - according to the direction of the Prime Minister.

Currently, in Ho Chi Minh City, there are about 360 areas with about 55,000 lots and plots eligible for exemption from construction permits.

For areas that are eligible for exemption from construction permits, it is necessary to provide guidance for people to properly carry out construction registration procedures.

When implementing the removal of construction permits, people will not be burdened with the same procedures as before. However, for functional units of the government, it is necessary to strengthen construction supervision and prevent violations in construction.

People must also be aware of complying with construction regulations, not having to abandon the license to build arbitrarily, doing whatever they want, beyond the detailed planning. Not to mention, there are other violations such as the construction causing unsafety, causing environmental pollution, causing noise affecting residential areas.

To ensure people comply properly, the management agency must have strict regulations. In addition to detailed 1/500 planning, there must be urban design, construction height, ground clearance, sidewalks and other regulations on environmental protection and construction safety.

A limitation of Vietnamese urban areas today is architectural aesthetics, so they are oriented towards overall designs and color regulations, to ensure aesthetic harmony in urban space.

People do not apply for a construction permit, but the government must check to handle the dispute. There are many cases of construction encroaching on other people's land, even building on other people's land or having incomplete land use right documents. In these cases, the authorities must prevent and take measures to handle them.

Abolish procedures to create favorable conditions for people in building houses but must tighten management. For cases of intentional violations, they must be resolutely enforced to be dismantled. Do not let the preservation, receipt of money and then ignore violations in construction as has happened.

Lê Thanh Phong
RELATED NEWS

HCMC does not allow people to apply for construction permits in areas with detailed planning

|

HCMC - Chairman of the HCMC People's Committee Nguyen Van Duoc suggested that in areas with detailed planning, people only need to register for construction, not have to apply for a license.

Temporary proposal for People's Committees of wards and communes granted construction permits in Ho Chi Minh City

|

HCMC - The Department of Construction proposed to temporarily assign the People's Committees at the commune level to be licensed to build individual houses (except for level II and above)...

8th grade male student in Lao Cai stabbed by a friend, thrown into a lake: Family requests strict handling

|

Lao Cai - The male student's family hopes that the authorities will take drastic action and strictly handle school violence.

Russia declares to seize Ukraine's key logistics hub for 1 week

|

Russia insists the progress of controlling the Kupyansk region is fast and on schedule.

Raising warning, storm No. 13 will cause level 4 natural disaster risks, Military Region 5 proactively helps people

|

It is forecasted that by 7:00 p.m. tonight (November 6), the center of storm No. 13 will be located in the coastal area of Quang Ngai - Dak Lak, maintaining the intensity of level 13 - 14, gusting to level 17.

DT601 route has many cracks appearing after prolonged heavy rain in Da Nang

|

Da Nang - DT601 road through Hai Van ward has many long subsidence sections, causing danger to traffic participants.

Behind the sudden profits of real estate businesses

|

A series of real estate enterprises reported interest rates increasing dozens of times in the third quarter of 2025. However, most of them do not come from core business activities.

Storm No. 13 has not yet arrived, dozens of people in Quang Ngai are hospitalized due to accidents during storm prevention

|

Quang Ngai - Storm No. 13 has not made landfall yet, but dozens of people have been injured while tying up their houses, pruning trees, and many serious injuries have required hospitalization.

HCMC does not allow people to apply for construction permits in areas with detailed planning

MINH QUÂN |

HCMC - Chairman of the HCMC People's Committee Nguyen Van Duoc suggested that in areas with detailed planning, people only need to register for construction, not have to apply for a license.

Temporary proposal for People's Committees of wards and communes granted construction permits in Ho Chi Minh City

Huyền Trân |

HCMC - The Department of Construction proposed to temporarily assign the People's Committees at the commune level to be licensed to build individual houses (except for level II and above)...