According to the Hanoi Department of Construction, due to the impact of the circulation after storm No. 5, the city experienced heavy and prolonged rain, many locations with very large rainfall led to overloading the drainage system of the area, narrowing the road surface, vehicles participated in slow traffic, especially on Vo Chi Cong route (from Vo Chi Cong - Nguyen Hoang Ton intersection to Nhat Tan bridge approach road).
Therefore, the Hanoi Department of Construction guides remote traffic flow on Vo Chi Cong Street (from Vo Chi Cong - Nguyen Hoang Ton intersection to Nhat Tan Bridge approach road) so that people and vehicles participating in traffic can proactively adjust the route accordingly.
Accordingly, vehicles from Vo Chi Cong go to Nhat Tan Bridge in the following directions: Vo Chi Cong → Xuan La, Nguyen Hoang Ton → Lac Long Quan → An Duong Vuong → Branch leading to Nhat Tan Bridge.
From Nhat Tan Bridge to Vo Chi Cong, vehicles need to enter the city center in the direction of Nhat Tan Bridge → branch leading down to An Duong Vuong → Au Co, Lac Long Quan → city center.
Vehicles travel on routes connecting the Ring Road 2 axis in the direction of Nhat Tan Bridge → branch leading to An Duong Vuong Street → 40m road connecting from Nhat Tan Bridge to Thang Long Bridge → internal routes of Ciputra Urban Area → Nguyen Hoang Ton → Vo Chi Cong.
Vehicles travel on the routes connecting the Ring Road 3 axis in the direction of Nhat Tan Bridge → branch leading to An Duong Vuong Street → 40m road connecting from Nhat Tan Bridge to Thang Long Bridge → Pham Van Dong, elevated Ring Road 3.