Research on turning To Lich River into a place to store water during floods

KHÁNH AN |

Hanoi - The city assigned the Department of Planning and Architecture and related units to study turning To Lich River into a place to store water during flooding.

On March 12, the Office of the Hanoi People's Committee issued a notice of the conclusion of Vice Chairman of the Hanoi People's Committee Duong Duc Tuan at the meeting to listen to a report on the design plan to renovate the To Lich River.

Accordingly, the City People's Committee basically agrees with the research direction and proposal of Sun Group Joint Stock Company - Sun Group, the basic design plan that meets the city's criteria and orientations and programs and plans that have been and are being implemented, with the goal of turning To Lich River into a green space, a landscape and ecological highlight to serve the community.

To create synchronization with the programs, the City People's Committee assigned the Department of Planning and Architecture and the Institute of Construction Planning to coordinate with Sun Group Company to complete the design plan, ensuring synchronization with the programs and plans that have been implemented.

The contents that need to be updated include updating, including including the detailed planning project at a scale of 1/500 on both sides of the To Lich River in sections 1, 2, 3 that have been approved by the City People's Committee; updating the content of the renovation of the two sides of the To Lich River in the Project "Restoration of environmental quality and development of the system of 4 inner-city rivers: To Lich, Kim Nguu, Lu, Set" according to the program of the City Party Committee being studied and implemented.

At the same time, clarify further the technological solutions for treating the riverbed to clean the riverbed; study the content of turning To Lich River into a place to store water when flooding the To Lich River basin in the Capital Drainage Plan; evaluate the interaction of the technical infrastructure system along the route ( Bailey steel bridges in the traffic technical infrastructure network) with the design plan.

Along with that, study more carefully the embankments on both sides of the river (where can it be expanded; where not) to create space with many landscapes that both allow the expansion of the To Lich River water surface, and at the same time create land funds for the development of public service works; agree on the plan to report to the City People's Committee for consideration and direction.

The City People's Committee assigned the Department of Finance to study the implementation mechanism for the To Lich River renovation plan (in the direction of applying the BT form) to advise, propose, and report to the City People's Committee for consideration and direction.

KHÁNH AN
RELATED NEWS

Hanoi launches plan to replenish water in West Lake for To Lich

|

Hanoi - Hanoi Drainage One Member Co., Ltd. is dredging the entire To Lich River, starting from the Hoang Quoc Viet - Buoi intersection.

There is no "safe zone" for the leader if leadership is relaxed

|

Head of the Central Propaganda and Mass Mobilization Commission Trinh Van Quyet clearly stated that there is no "safe zone" for the head if leadership is relaxed.

Clarify the authority to organize villages and residential groups in the draft revised Capital Law

|

National Assembly Deputy Tran Thi Nhi Ha said that it is necessary to clarify the authority to organize villages and residential groups in Article 7 of the draft Capital Law (amended).

Red River in a 100-year vision: Awakening the urban face of Hanoi in the future

|

In the Hanoi Capital Master Plan with a 100-year vision, the Red River is identified as the central landscape axis and a new symbol of the city's development.

Hungarian Prime Minister Viktor Orban loses election after 16 years in power

|

Hungarian Prime Minister Viktor Orban admitted a heavy defeat in the landmark election on April 12, ending 16 years in power.

Laborers no longer jump jobs based on feelings

|

Job hopping after the Lunar New Year is a common occurrence in the labor market. However, in the new context, many workers no longer jump jobs emotionally.

Bridge and road project worth nearly 10,200 billion VND in Hanoi is under construction and waiting for site clearance

|

Hanoi - The site has not been completely handed over, affecting the progress of the Ngoc Hoi bridge and approach roads at both ends of the bridge, with a total capital of nearly 10,200 billion VND.

Hanoi launches plan to replenish water in West Lake for To Lich

KHÁNH AN |

Hanoi - Hanoi Drainage One Member Co., Ltd. is dredging the entire To Lich River, starting from the Hoang Quoc Viet - Buoi intersection.

Hiện trạng sông Tô Lịch trước khi được bổ cập nước từ hồ Tây

KHÁNH AN |

Trước khi Hà Nội lấy nước từ hồ Tây để bổ cập cho sông Tô Lịch, dòng sông này vẫn trong tình trạng ô nhiễm nặng, được coi là một dòng sông chết.

Hà Nội lấy nước từ hồ Tây để bổ cập cho sông Tô Lịch

KHÁNH AN |

Trước mắt, Hà Nội sử dụng nước từ sông Hồng và nước sau xử lý của nhà máy xử lý nước thải hồ Tây để bổ cập nước cho hồ Tây rồi bổ cập vào sông Tô Lịch.