On the morning of September 9, speaking with Lao Dong Newspaper reporter, Mr. Ha Quang Khanh - Chairman of Hoang Van Thu Ward People's Committee, Thai Nguyen City, said that at around 1:00 a.m. the same day, the authorities had assisted in evacuating about 50 households, about 200 people, from building A3 of Tien Bo apartment building to the opposite building.
Initial information shows that the rising water level of the Cau River has flooded the entire area around the apartment building. Part of the foundation of building A3 has been exposed, posing a high risk of insecurity.
The apartment building management board has cut off power to the entire building and, together with the authorities, evacuated residents to a safe place.
The flood level here is currently about 1 meter high.