Phu Tho implements a 985 billion VND project to build a road connecting Van Phuc bridge

Tô Công |

Phu Tho - The road connecting the left dyke of the Red River with Van Phuc bridge will be officially constructed after the contractor selection work is completed.

Component project 2: Investment in construction of the traffic route connecting from the left dyke of the Red River to Van Phuc bridge - with a total investment of nearly 985 billion VND invested by Vinh Phuc Regional Project Management Board (Phu Tho province).

According to the reporter's investigation, on September 4, the investor had a decision approving the contractor selection results for the "Construction + Equipment" package of the project.

According to the approval decision, the Van Phuc bridge package consortium including: Truong Son Construction Corporation, Investment and Construction Joint Stock Company No. 18, Road and Bridge Joint Stock Company 10 - won the bid with a price of more than 789 billion VND.

Thus, the joint venture of contractors mentioned above will officially start construction of the road with a total length of about 2.12km connecting from the left dike of the Red River to Van Phuc bridge, located in Lien Chau commune, Phu Tho province.

The starting point of the route is at Km7+760 (Lien Chau commune), connecting to the ending point of the Van Phuc bridge construction project across the Red River and the connecting road to National Highway 32 invested by the Hanoi City People's Committee. The ending point is about Km9+880, belonging to the left dike of the Red River (Lien Chau commune).

Đường dẫn cầu Vân Phúc kết nối Quốc lộ 32. Ảnh:
Van Phuc bridge access road connecting National Highway 32. Photo: Pham Bien

This is a large-scale road project with a main line of 23.5m wide (4 lanes for motorized vehicles, each lane 3.5m wide; 2 lanes for rudimentary vehicles each lane 3m wide...), combined with a 5.0m wide auxiliary service road and a 20.5m wide approach bridge. Design speed 80km/h.

According to the investor, the goal of the project is to gradually complete the transportation system according to the approved plan; create an additional traffic route connecting Phu Tho province with Hanoi Capital across the Red River.

The road will serve the needs of goods circulation, production and travel needs of people; promote socio-economic development connection between Phu Tho province and Hanoi and provinces in the Capital region, the key economic region of the North.

For the Van Phuc bridge construction investment project - with a total investment including site clearance of about 3,443 billion VND, construction costs of 2,613 billion VND.

The project under construction has its starting point intersecting with National Highway 32 in Phuc Tho commune; the ending point connecting to the Traffic Line project connecting from the left dyke of the Red River to Van Phuc bridge (the administrative boundary between Hanoi and Phu Tho).

Tô Công
RELATED NEWS

Ring Road 1 is preparing for technical opening, Ring Road 2.5 and the bridge over the Red River are accelerating

|

Hanoi - Many key traffic projects such as Ring Road 1, Ring Road 2.5, bridges across the Red River... are being accelerated during the National Day 2/9 holiday.

My Anh talks about the similarities and differences between her father Anh Quan and mother My Linh

|

My Anh shared about her journey of maturity in music with the companionship of diva My Linh and musician Anh Quan.

Police break down to rescue 4 people trapped in a burning house at dawn

|

Da Nang - House fire at dawn, 4 people trapped were promptly broken down and rescued by the Fire and Rescue Police.

Exciting opening day, students eagerly enter the new school year

|

On the morning of September 5th, millions of students across the country together opened the school year, entering the school year with many good expectations.

Collision with train in Ho Chi Minh City, one person died

|

One person died after a collision with a train on the North-South railway line, passing through Hiep Binh ward, Ho Chi Minh City on the morning of September 5.

Land of Tay Nam Kim Giang project covers illegal factories and sports fields despite power cuts

|

Hanoi - Although Thanh Liet ward requested to dismantle and cut off all electricity, a series of illegal factories and sports fields are still operating publicly.

Ring Road 1 is preparing for technical opening, Ring Road 2.5 and the bridge over the Red River are accelerating

SÓNG HỮU |

Hanoi - Many key traffic projects such as Ring Road 1, Ring Road 2.5, bridges across the Red River... are being accelerated during the National Day 2/9 holiday.

Khởi tố thêm giám đốc trong vụ lan can kè sông Hồng gãy đổ ở Lào Cai

Đinh Đại |

Lào Cai - Cơ quan Cảnh sát điều tra vừa khởi tố, bắt tạm giam thêm một giám đốc liên quan đến những sai phạm tại công trình lan can đá bờ sông Hồng.

Chủ đầu tư nêu kiến nghị để phát huy hiệu quả cầu Vân Phúc khi hoàn thành

SÓNG HỮU |

Ban Quản lý dự án đầu tư xây dựng công trình giao thông Hà Nội có kiến nghị với UBND thành phố liên quan đến hiệu quả đầu tư cầu Vân Phúc sau khi hoàn thành.