RELATED NEWS

Chuong Duong bridge is overloaded for many days, Long Bien bridge accelerates to complete repairs

|

Hanoi - Chuong Duong bridge is congested for a long time due to increased traffic pressure, Long Bien bridge is being quickly repaired to soon reduce the load on the area.

Long Bien Bridge pedestrian road has a new look in May

|

Hanoi - The repair of roads, motorbike roads and rudimentary vehicles of Long Bien Bridge is being implemented by the construction unit, expected to be completed before May 28.

People excitedly check-in at the poetic pink grass garden at the foot of Long Bien bridge

|

Hanoi - The brilliant pink grass garden located on the alluvial ground along the Red River at the foot of Long Bien Bridge is becoming a check-in spot attracting a large number of people in the Capital.

Laughing out loud at the monkey bridge ride in U Minh Ha forest

|

Ca Mau - Monkey bridge challenge is within the framework of the 2026 U Minh Forest Fragrance event, bringing a lot of laughter to players and viewers.

Coach Kim Sang-sik believes Vietnam can create a surprise at the Asian Cup

|

Coach Kim Sang-sik assessed that Vietnam's group stage at the 2027 Asian Cup is very difficult, but still believes that the home team can create a surprise.

Base salary is expected to increase by 8%, experts propose salary payment mechanism reform

|

Experts believe that increasing the base salary by about 8% is a positive sign, but it needs to be accompanied by salary payment mechanism reform to retain good personnel.

Tourist ship with hantavirus outbreak arrives on Spanish island, WHO speaks out to reassure

|

WHO Director-General reassures people on the island of Spain, where passengers on a cruise ship with a hantavirus outbreak are expected to be brought ashore.

The US, Mexico and Canada hold three separate opening ceremonies for the 2026 World Cup

|

FIFA confirms World Cup 2026 will have three separate opening ceremonies in the US, Mexico and Canada, gathering a series of famous stars.

Chuong Duong bridge is overloaded for many days, Long Bien bridge accelerates to complete repairs

Tô Thế |

Hanoi - Chuong Duong bridge is congested for a long time due to increased traffic pressure, Long Bien bridge is being quickly repaired to soon reduce the load on the area.

Long Bien Bridge pedestrian road has a new look in May

CHÁNH TIẾN |

Hanoi - The repair of roads, motorbike roads and rudimentary vehicles of Long Bien Bridge is being implemented by the construction unit, expected to be completed before May 28.

People excitedly check-in at the poetic pink grass garden at the foot of Long Bien bridge

PHÚC LỘC - HƯƠNG LY |

Hanoi - The brilliant pink grass garden located on the alluvial ground along the Red River at the foot of Long Bien Bridge is becoming a check-in spot attracting a large number of people in the Capital.