Nam Dinh establishes 3 more industrial clusters with a total capital of more than VND 2,200 billion
On June 6, the People's Committee of Nam Dinh province issued decisions on the establishment of 3 industrial clusters (ICs), with a total investment of more than VND 2,200 billion.

According to the decisions, Rang Dong Industrial Park has an area of about 69.6 hectares in Rang Dong town, Nghia Hung district, Nam Dinh province; of which phase I is about 50 hectares, phase II is about 19.6 hectares.
The investor in the construction of technical infrastructure for Rang Dong Industrial Park is Hung Long VINA Joint Stock Company, with a total investment capital of 779 billion VND.
The industry operates mainly: producing colored metal and metal products; Mechanical processing, metal coating; High -tech mechanics; electronic production, computers and optical products; manufacturing and assembling high -tech electrical and electronics; food production and processing; seafood processing; handicrafts; Wood processing; production of construction materials; warehousing and storing goods for production of ICs; Producing components, auto parts, automobile assembly and other processing and manufacturing industries, ... See more ...
Viglacera wants to build an urban area worth over VND2.4 trillion in Bac Ninh
The new urban area project in the Northwest of Bac Ninh city (zone 4) proposed by Viglacera is being appraised by the province.

The People's Committee of Bac Ninh province has just sent a document to the Ministry of National Defense and the Ministry of Public Security to seek appraisal opinions on the proposal to approve the investment policy of the New Urban Area Project in the Northwest of Bac Ninh city (zone 4).
The province proposed that the two ministries determine whether the project is in an area that needs to ensure national defense and security. This is the basis for determining whether the project is licensed for sale to foreigners or not.
The Northwest New Urban Area Project of Bac Ninh city (zone 4) is located in Hoa Long ward and Vu Ninh ward, Bac Ninh city.
The project scale is about 22 hectares; investment in the construction of works: Low-rise housing, commercial and service works; social infrastructure works... See more...
Details of 43 routes to be built and expanded in Tay Ho district in 2025
According to the 2025 land use plan, Tay Ho district (Hanoi) has 106 projects, of which 43 projects are for construction, renovation and expansion of roads.

The Hanoi People's Committee has just issued a decision to adjust and supplement the 2025 land use plan of Tay Ho district, adding 17 more projects with a total area of 46.84 hectares.
Previously, in the 2025 land use plan approved at the beginning of the year, Tay Ho district had 89 projects, with a total area of 348.92 hectares. Thus, up to now, the whole district has 106 projects in this year's land use plan, with a total area of 395.76 hectares. See more...
More than 1,700 households are considered and resettled for the expressway project passing through Dong Nai province
On June 6, according to the People's Committee of Long Thanh district (Dong Nai), up to now, more than 1,700 households have been considered and resettled to implement the investment project to build the Bien Hoa - Vung Tau expressway, phase 1, through Long Thanh district.
Of the more than 1,700 households that have been considered and resettled, more than 800 households have been resettled, the rest are cases that are being reviewed for drawing lots, have not been approved or are not eligible. In addition, the locality has also approved a plan to support temporary housing for 367 cases with an amount of nearly 6 billion VND.

Regarding site handover, up to now, component project 1 has handed over 77.24 ha/77.91 ha reaching 99.14%; component project 2 has handed over 150.09 ha/150.09 ha reaching 100%. The Bien Hoa - Vung Tau Expressway Project, the section through Bien Hoa City, has completed 100% of site clearance.
In Long Thanh district, 8/9 localities have handed over 100% of the site (An Phuoc commune, Loc An, Long An, Long Phuoc, Phuoc Thai, Tan Hiep, Phuoc Binh and Long Thanh town). Currently, there are 41 cases/0.67 hectares in Long Duc commune that have not yet handed over the site. See more...