Hanoi is about to start construction of social housing with more than 1,100 apartments, selling price of 18.4 million/m2

Cường Ngô |

The Thang Long Green City social housing project is expected to be completed and put into use from the fourth quarter of 2026, with 1,104 apartments.

On March 3, the Joint Venture of Hanoi Housing Investment and Development Corporation (HANDICO) and Viglacera Corporation - JSC will officially start construction of 1,104 social housing apartments at plot CT3, Thang Long Green City project, Kim Chung urban area (Dong Anh, Hanoi).

The project has a total area of nearly 3.7 hectares, including three units on the CT3 plot and a building on the CT4 plot, 12 floors high, providing a total of 1,588 apartments, accommodating about 5,429 people, with a selling price ranging from 18.4 million VND/m2.

Previously, the project at CT4 land plot was started in October 2018 and completed and put into use in the fourth quarter of 2021. The project includes a 12-storey apartment building and an attic, with a total construction floor area of about 44,368.7 m2.

Of which, the basement area is 4,537 m2, the first floor area is 4,010 m2, the floor area from the second floor to the attic is 35,821.7 m2. With 484 apartments, the project has met the housing needs of 1,527 people, contributing to solving the problem of social security, creating jobs and stimulating consumption.

The project at the CT3 land plot includes three units CT3A, CT3B, CT3C, each building is 12 floors high and has an attic. The total construction floor area is about 109,410.2 m2, of which the basement area is 15,660 m2, the first floor area is 7,804 m2, the floor area from the second floor to the attic is 85,946.2 m2.

It is expected that the project will be completed and put into use from the fourth quarter of 2026, providing 1,104 apartments for about 3,902 people, contributing to the implementation of the Hanoi City Housing Development Plan for the period 2021-2025 and the Government's 1 million social housing apartments project.

The project has a favorable location, quick connection to the city center and neighboring areas, helping residents easily access public utilities, medical services, education and trade. The apartments are designed by Singaporean architects, making the most of natural light and ventilation effectively, helping to save energy and create a comfortable living space.

The apartment area ranges from 49.75 m2 to 63.8 m2, optimizing the usable space, bringing convenience to residents. The project uses Viglacera's high-quality materials such as gas concrete, high-quality tiles, energy-saving glass and modern sanitary equipment, ensuring durability and reducing maintenance costs.

Cường Ngô
TIN LIÊN QUAN

Difficulty accessing capital, social housing projects behind schedule

|

Tien Giang - After more than 8 years of construction, the HQC Tan Huong social housing project (Tien Giang) has not yet been completed due to difficulties in accessing loans.

Breakthrough and new determination in thinking about building social housing

|

On February 27, concluding the Conference of the Government Standing Committee working with State-owned enterprises, Politburo member and Prime Minister Pham Minh Chinh told a very real story: "The project has more than 100 social housing apartments that more than 1,000 people drew up".

Announcing the selling price of social housing in Dong Mai Industrial Park, Quang Ninh

|

Quang Ninh - The investor of the Dong Mai Industrial Park social housing project, Quang Yen town has just announced the receipt of applications to register to buy and rent houses in the project.

Quang Ninh speaks out before controversy over cave music

|

Quang Ninh - In response to mixed opinions, the tourism industry supports organizing a concert in a cave in Bai Tu Long Bay. Because this is a unique product, not entangled in regulations.

Nam Dinh Club firmly holds the top spot in V.League after the victory over The Cong Viettel

|

Nam Dinh Club defeated The Cong Viettel 2-0 in round 15 of LPBank V.League 2024-2025 on the evening of February 28.

The Ministry of Public Security is tasked with ensuring network information security

|

From tomorrow (March 1), the Ministry of Public Security assigned the Department of Cyber Security and High-Tech Crime Prevention to officially deploy the task of ensuring network information security.

Dong Holding's financial crisis is global, the company is paralyzed

|

Rang Dong Holding is in a comprehensive crisis, all board members resign, both the parent company and its subsidiaries have stopped operations, the audit has withdrawn...

Propaganda work team, female workers must have a job and enthusiasm

|

On the afternoon of February 28, the Vietnam General Confederation of Labor held a conference to deploy tasks of propaganda work and women's union work in 2025. The conference was held in person and online.

Difficulty accessing capital, social housing projects behind schedule

Thành Nhân |

Tien Giang - After more than 8 years of construction, the HQC Tan Huong social housing project (Tien Giang) has not yet been completed due to difficulties in accessing loans.

Breakthrough and new determination in thinking about building social housing

Hoàng Lâm |

On February 27, concluding the Conference of the Government Standing Committee working with State-owned enterprises, Politburo member and Prime Minister Pham Minh Chinh told a very real story: "The project has more than 100 social housing apartments that more than 1,000 people drew up".

Announcing the selling price of social housing in Dong Mai Industrial Park, Quang Ninh

Quảng Ninh |

Quang Ninh - The investor of the Dong Mai Industrial Park social housing project, Quang Yen town has just announced the receipt of applications to register to buy and rent houses in the project.