The Housing Project in Uy No Commune, Dong Anh District, Phase 2: The High-rise Housing Area - Social Housing category was officially started on December 17, 2024. This is a positive signal from the market when low-cost social housing apartments are provided to the market, creating favorable conditions for people to settle down and start a business.
The Social Housing Project in Uy No Commune, Dong Anh District, Hanoi City is the first project of Corporation 319 in the field of social housing construction, with a total investment of more than 600 billion VND.

The project is built on a land area of 15,286m2; total construction area: 6,879.6m2, with 4 9-storey blocks (total floor area for all 4 blocks is about 61,086.2m2, construction density of 45%). The project is expected to be completed on October 30, 2026.
This project has a total of 466 apartments; The project has a basement (parking and technical functions); The total height of the project is 37.1m (from the elevation of the first floor to the top of the attic, the top of the first floor is 0.6m higher than the summer yard); The garden has landscape trees, children's playground.
fully enjoying all the amenities of the Calyx Residence project, residents of Uy No Dong Anh social housing can experience the comfortable, airy life that few inner-city projects have, all essential amenities are integrated into the project. 1.5ha internal park; Kindergarten with an area of 28,324m2, clinic; Parking area of 19,504m2; Commercial center building...
The apartments are designed to suit the needs and budgets of low-income customers, the apartments have an area of 40m2 - 70m2 designed with 2 bedrooms to meet the long-term housing needs of residents. With a large window and balcony system, every space in the house is always airy, filled with light and direct air from nature. 2-bedroom & 1WC apartment: 40m2 - 44m2; 2-bedroom & 2 WC apartment: 58.6m2 - 60.8m2 - 64.6m2 - 66.7m2 - 69.7m2.
According to information from the investor, the project not only solves the increasing housing demand in the Dong Anh area, but also promotes socio-economic development, creates jobs and contributes to building a sustainable community. At the same time, this is also a testament to the commitment of the Ministry of National Defense's 319 Corporation in implementing construction projects that meet quality standards and progress, contributing to enhancing the reputation and position of the enterprise in the construction sector.